8.1
Summary
of exceedance is provided in Appendix L.
8.2
No
Action/Limit Level exceedance was recorded for air
quality and construction noise.
8.3
All
water quality monitoring was conducted as scheduled in the reporting month. There
is three Action Level and one Limit Level exceedances for suspended solids were recorded.
8.4
According
to the investigation, no pollution discharge was observed from the marine
works. The exceedance at the monitoring station which
is situated at the upstream of the site and the exceeded results were similar
or within the ranges baseline monitoring results. Therefore, the exceedances are considered not due to the Contract.
8.5
No environmental
related complaint was received in the reporting month. The Complaint Log is
attached in Appendix P.
8.6
There
was no prosecution or notification of summons received since the Contract commencement.