Contract No. HY/2011/09
Hong Kong-Zhuhai-Macao
Bridge Hong Kong Link Road ¡V
Section between HKSAR
Boundary and Scenic Hill
Exceedance
Report
(A) Exceedance
Report for Air Quality (1 hour TSP)
(NIL
in the
reporting period)
(B)
Exceedance Report for Air Quality (24 hours TSP)
(NIL
in the
reporting period)
(C) Exceedance
Report for Construction Noise
(NIL
in the
reporting period)
(D) Exceedance
Report for Water Quality
Environmental Monitoring |
Parameter |
No. of Exceedance |
No. of Exceedance related to the Construction Activities of this Contract |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
||
Water Quality |
Dissolved Oxygen (DO)
(Surface & Middle) |
0 |
0 |
0 |
0 |
Dissolved Oxygen (DO)
(Bottom) |
0 |
0 |
0 |
0 |
|
Turbidity |
1 |
0 |
0 |
0 |
|
Suspended Solids (SS) |
5 |
3 |
0 |
0 |