Table 7.1        Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

02/10/2013

Clear the water at wheel washing bay regularly at Portion C.

Rectification/improvement was observed during the follow-up audit session on 7 October 2013.

16/10/2013

To repair the damage silt curtain at P20.

Rectification/improvement was observed during the follow-up audit session on 22 October 2013.

22/10/2013

To remove the piles which contact to the sea at Portion A. (near P104)

Rectification/improvement was observed during the follow-up audit session on 29 October 2013.

29/10/2013

To repair the damage silt curtain at P73.

Rectification/improvement was observed during the follow-up audit session on 5 November 2013.

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

07/10/2013

Provide water spray for the dry exposed area at WA4.

Rectification/improvement was observed during the follow-up audit session on 16 October 2013.

29/10/2013

To check and repair the air compressor at P73 to avoid emitting heavy smoke.

Rectification/improvement was observed during the follow-up audit session on 5 November 2013.

Noise

16/10/2013

Provide acoustic decoupling measures for the generator at P73.

Rectification/improvement was observed during the follow-up audit session on 22 October 2013.

Waste / Chemical Management

02/10/2013

To plug the drip tray for the generator at Portion C.

Rectification/improvement was observed during the follow-up audit session on 7 October 2013.

02/10/2013

Clear the oil spillage as chemical waste at WA4.

Rectification/improvement was observed during the follow-up audit session on 7 October 2013.

16/10/2013

Oil leakage was observed from the RCD at P73. The Contractor was reminded to check and repair the equipment, if necessary to avoid further leakage.

Rectification/improvement was observed during the follow-up audit session on 22 October 2013.

22/10/2013

To remove the construction materials / wastes at near the trees at Portion C.

Rectification/improvement was observed during the follow-up audit session on 29 October 2013.

22/10/2013

To clear the oil stains at near the threading machine.

Rectification/improvement was observed during the follow-up audit session on 29 October 2013.

22/10/2013

To clear the packing wastes at near the threading machine.

Rectification/improvement was observed during the follow-up audit session on 29 October 2013.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

29/10/2013

To update the environmental permit which displayed at P65.

Rectification/improvement was observed during the follow-up audit session on 5 November 2013.

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

N/A(2)

N/A(2)

N/A(2)

Remark: N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.

N/A(2) No archaeological site inspection was conducted in the reporting month.