Table
7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
02/10/2013 |
Clear the water at wheel washing bay
regularly at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 7 October 2013. |
16/10/2013 |
To repair the
damage silt curtain at P20. |
Rectification/improvement
was observed during the follow-up audit session on 22 October 2013. |
|
22/10/2013 |
To remove the
piles which contact to the sea at Portion A. (near P104) |
Rectification/improvement
was observed during the follow-up audit session on 29 October 2013. |
|
29/10/2013 |
To repair the
damage silt curtain at P73. |
Rectification/improvement
was observed during the follow-up audit session on 5 November 2013. |
|
Ecology |
N/A(1) |
N/A(1) |
N/A(1) |
Air Quality |
07/10/2013 |
Provide water spray for the dry exposed
area at WA4. |
Rectification/improvement
was observed during the follow-up audit session on 16 October 2013. |
29/10/2013 |
To check and repair the air compressor at
P73 to avoid emitting heavy smoke. |
Rectification/improvement
was observed during the follow-up audit session on 5 November 2013. |
|
Noise |
16/10/2013 |
Provide acoustic decoupling measures for
the generator at P73. |
Rectification/improvement
was observed during the follow-up audit session on 22 October 2013. |
Waste / Chemical Management |
02/10/2013 |
To plug the
drip tray for the generator at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 7 October 2013. |
02/10/2013 |
Clear the oil
spillage as chemical waste at WA4. |
Rectification/improvement
was observed during the follow-up audit session on 7 October 2013. |
|
16/10/2013 |
Oil leakage was
observed from the RCD at P73. The Contractor was reminded to check and repair
the equipment, if necessary to avoid further leakage. |
Rectification/improvement
was observed during the follow-up audit session on 22 October 2013. |
|
22/10/2013 |
To remove the
construction materials / wastes at near the trees at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 29 October 2013. |
|
22/10/2013 |
To clear the
oil stains at near the threading machine. |
Rectification/improvement
was observed during the follow-up audit session on 29 October 2013. |
|
22/10/2013 |
To clear the
packing wastes at near the threading machine. |
Rectification/improvement
was observed during the follow-up audit session on 29 October 2013. |
|
Landscape & Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
29/10/2013 |
To update the
environmental permit which displayed at P65. |
Rectification/improvement
was observed during the follow-up audit session on 5 November 2013. |
Cultural Heritage (Sha Lo Wan
(West) Archaeological Site) |
N/A(2) |
N/A(2) |
N/A(2) |
Remark: N/A(1)
- No major environmental deficiency was identified during the site
inspection in the reporting month.
N/A(2) No archaeological site inspection
was conducted in the reporting month.