Table
7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
05/11/2013 |
A blue tube with pump was observed connecting to the sea directly at
P103. The contractor was reminded to ensure all site discharge should be
treated with de-silting facilities before discharging out. |
Rectification/improvement
was observed during the follow-up audit session on 12 November 2013. |
19/11/2013 |
To provide de-silting facilities for treating
muddy water at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 29 November 2013. |
|
19/11/2013 |
Clear the wastes and sediment at the drainage
channel at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 29 November 2013. |
|
19/11/2013 |
To remove the blue pipe which directly connecting
to the sea at P105. |
Rectification/improvement
was observed during the follow-up audit session on 29 November 2013. |
|
19/11/2013 |
Provide sand bag bund to surround area of works
at near the site entrance at Portion A. |
Rectification/improvement
was observed during the follow-up audit session on 29 November 2013. |
|
29/11/2013 |
The water at the wheel washing bay a Portion A
should be cleared. |
Rectification/improvement
was observed during the follow-up audit session on 3 December 2013. |
|
Ecology |
12/11/2013 |
Provide fencing for protecting the tree at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 19 November 2013. |
29/11/2013 |
The disturbance to the retain trees should be avoided at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 3 December 2013. |
|
Air Quality |
12/11/2013 |
Cement bags were not covered and dust generation was observed from
the cement de-bagging works at P105. The Contractor was reminded to modify
the enclosure and cover the cement bags properly. |
Rectification/improvement
was observed during the follow-up audit session on 19 November 2013. |
29/11/2013 |
Properly cover / provide water spray for the stockpile of soil at
Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 3 December 2013. |
|
Noise |
29/11/2013 |
Provide the noise emission label for the breaker (>10kg) at near
P104. |
Rectification/improvement
was observed during the follow-up audit session on 3 December 2013. |
Waste /
Chemical Management |
05/11/2013 |
Clear the oil stain at near the chemical
container and drainage channel at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 12 November 2013. |
05/11/2013 |
Clear the waste materials at the seawall area at
P105. |
Rectification/improvement
was observed during the follow-up audit session on 12 November 2013. |
|
12/11/2013 |
To remove the chemical containers along from the
drain at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 19 November 2013. |
|
12/11/2013 |
Clear the waste materials at the seawall area at
P105. |
Rectification/improvement
was observed during the follow-up audit session on 29 November 2013. |
|
19/11/2013 |
Clear the oil leakage from the breaker and oil
container at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 29 November 2013. |
|
19/11/2013 |
Clear the wastes and sediment at the drainage channel
at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 29 November 2013. |
|
19/11/2013 |
Clear the wastes material at the seawall area at
P105. |
Rectification/improvement
was observed during the follow-up audit session on 29 November 2013. |
|
29/11/2013 |
To plug the hole of drip tray at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 29 November 2013. |
|
Landscape
& Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
19/11/2013 |
To display the environmental permit at the new
site entrance at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 29 November 2013. |
Cultural Heritage (Sha Lo Wan (West) Archaeological Site) |
N/A(2) |
N/A(2) |
N/A(2) |
Remark: N/A(1)
- No major environmental deficiency was identified during the site
inspection in the reporting month.
N/A(2)
No archaeological site inspection was conducted in the reporting month.