Table I            Summary Table for Monitoring Activities in the Reporting Month

 

Parameter(s)

Date(s)

1-hr TSP Monitoring

6th, 12th, 18th, 22nd and 28th November 2013

24-hr TSP Monitoring

6th, 12th, 18th, 22nd and 28th November 2013

Noise Monitoring

7th, 13th , 19th  and 25th November 2013

Water Quality Monitoring

1st, 4th, 6th, 8th, 11th, 13th, 15th, 18th, 20th, 22nd, 26th , 28th and 30th November 2013

Dolphin Monitoring (Line-transect Vessel Surveys)

6th and 15th November 2013

Additional Land-based Dolphin Behaviour and Movement Monitoring

(1) N/A

Environmental Site Inspection

5th, 12th, 19th  and 29th November 2013

Archaeological Site Inspection

(2)N/A

          Remark: (1) The additional land-based dolphin behavior and movement monitoring was not conducted in the reporting month. In view of the construction activities have no significant change in the two months, the monitoring in November and December 2013 will be considered/reviewed in the monthly EM&A report for December 2013.

  (2) No archaeological site inspection was conducted in the reporting month.