Table I Summary
Table for Monitoring Activities in the Reporting Month
|
Parameter(s) |
Date(s) |
|
1-hr TSP Monitoring |
6th, 12th,
18th, 22nd and 28th November 2013 |
|
24-hr TSP Monitoring |
6th, 12th,
18th, 22nd and 28th November 2013 |
|
Noise Monitoring |
7th, 13th
, 19th and 25th
November 2013 |
|
Water Quality Monitoring |
1st, 4th,
6th, 8th, 11th, 13th, 15th,
18th, 20th, 22nd, 26th , 28th
and 30th November 2013 |
|
6th and 15th
November 2013 |
|
|
Additional Land-based Dolphin Behaviour
and Movement Monitoring |
(1) N/A |
|
Environmental Site Inspection |
5th, 12th,
19th and 29th
November 2013 |
|
Archaeological Site Inspection |
(2)N/A |
Remark:
(1) The additional land-based dolphin behavior and movement
monitoring was not conducted in the reporting month. In view of the
construction activities have no significant change in the two months, the
monitoring in November and December 2013 will be considered/reviewed
in the monthly EM&A report for December 2013.
(2) No archaeological site inspection was conducted
in the reporting month.