10           CONCLUSIONS AND RECOMMENDATIONS

Conclusions

10.1     The Environmental Monitoring and Audit (EM&A) Report presents the EM&A works undertaken in November 2013 in accordance with EM&A Manual. 

 

10.2     No Action/Limit Level exceedance was recorded for air quality (24-hr TSP) and construction noise.

 

10.3     For 1-hour TSP monitoring, no Action Level exceedance was recorded. One Limit Level exceedance was recorded on 18 November 2013.

10.4     According to the investigation, no dust generation works was conducted at near the monitoring station during the monitoring and observable dust source from construction activity under Contract No. HY/2011/09 was observed. Therefore, the exceedance is considered not due to the Contract.

10.5     For water quality monitoring, there are seven Action Level and six Limit Level exceedances for suspended solids were recorded.

10.6     According to the investigation, no pollution discharge was observed from the site. In addition, sediment plume due to natural fluctuation of shallow water and localized plume in the monitoring area were observed. Water quality mitigation measures such as casting and silt curtain were also properly implemented. Therefore, the exceedances are considered not due to the Contract.

 

10.7     Dolphin transect survey was carried out on 6th and 15th November 2013. No adverse impact on Chinese White Dolphins was noticeable from general observations.

 

10.8     Environmental site inspection was conducted on 5th, 12th, 19th and 29th November 2013 by ET in the reporting month. All deficiencies identified during the site inspection have already rectified / improved during the follow-up audit session.

 

10.9     No inspection to the Sha Lo Wan (West) Archaeological Site was conducted in the reporting month.

 

10.10 There was one environmental complaint, no notification of summons and successful prosecution received.

 

10.11 The ET will keep track on the EM&A programme to ensure compliance of environmental requirements and the proper implementation of all necessary mitigation measures.

Recommendations

 

10.12 According to the environmental audit performed in the reporting month, the following recommendations were made:

 

Air Quality Impact

 

¡¤          To regularly maintain the quality of machinery and vehicles on site.

¡¤          To implement dust suppression measures on all haul roads, stockpiles, dry surfaces and excavation works.

¡¤          To provide hoarding along the entire length of that portion of the site boundary.

 

Noise Impact

 

¡¤          To inspect the noise sources inside the site.

¡¤          To space out noisy equipment and position the equipment as far away as possible from sensitive receivers.

¡¤          To provide temporary noise barriers for operations of noisy equipment near the noise sensitive receivers, if necessary.

 

Water Impact

 

¡¤     To prevent any surface runoff discharge into any stream course and sea.

¡¤     To review and implement temporary drainage system.

¡¤     To identify any wastewater discharges from site.

¡¤     To ensure properly maintenance for de-silting facilities.

¡¤     To clear the silt and sediment in the sedimentation tanks.

¡¤     To review the capacity of de-silting facilities for discharge.

¡¤     To divert all the water generated from construction site to de-silting facilities with enough handling capacity before discharge.

¡¤     To avoid accumulation of stagnant and ponding water on site.

 

Ecology Impact

 

¡¤     To implement Spill Response Plan in the event of accidental spillage of or other hazardous chemicals.

¡¤     To implement Dolphin Exclusion Zone during the installation of bored pile casing located in the waters to the west of Airport.

¡¤     To implement Dolphin Watching Plan after the bored piling casing is installed.

¡¤     To ensure the acoustically-decoupled measures were implemented for air compressors and other noisy equipment mounted on construction vessels according to acoustic decoupling measures plan. 

 

Waste/Chemical Management

 

¡¤          To check for any accumulation of waste materials or rubbish on site.

¡¤          To ensure the performance of sorting of C&D materials at source (during generation);

¡¤          To carry out inspection of dump truck at site exit to ensure inert and non-inert C&D materials are properly segregated before removing off site.

¡¤          To avoid any discharge or accidental spillage of chemical waste or oil directly from the site.

¡¤          To avoid improper handling or storage of oil drum on site.