Table 7.1           Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

03/12/2013

To remove the plant equipment which placed at near the sea at Portion A (P96).

Rectification/improvement was observed during the follow-up audit session on 10 December 2013.

03/12/2013

Provide mitigation measures to avoid the muddy water directly discharging to the gully at P92.

Rectification/improvement was observed during the follow-up audit session on 10 December 2013.

10/12/2013

Clear the floating wastes insider the silt curtain at P19.

Rectification/improvement was observed during the follow-up audit session on 17 December 2013.

10/12/2013

Clear the silt and debris at the platform at P19.

Rectification/improvement was observed during the follow-up audit session on 17 December 2013.

17/12/2013

Insufficient wastewater treatment facilities during rainstorm were observed at Portion C. The Contractor was reminded to review the capacity of the de-silting tank to ensure the discharge is comply with discharge license.

Follow-up action was needed for the item.

17/12/2013

To remove the plant equipment which placed at near the sea at P98.

Rectification/improvement was observed during the follow-up audit session on 24 December 2013.

17/12/2013

Properly cover the stockpile of soil at Portion C.

Rectification/improvement was observed during the follow-up audit session on 31 December 2013.

24/12/2013

To review the capacity of sedimentation tank at Portion C.

Follow-up action was needed for the item.

24/12/2013

To clear the wheel washing bay at Portion C.

Rectification/improvement was observed during the follow-up audit session on 31 December 2013.

24/12/2013

To direct the silty water to sedimentation facilities before discharging out at Portion C (site exit) and Portion A (P94).

Rectification/improvement was observed during the follow-up audit session on 31 December 2013.

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

03/12/2013

Provide water spray for the breaking works at Portion C.

Rectification/improvement was observed during the follow-up audit session on 10 December 2013.

17/12/2013

Properly cover the stockpile of soil at Portion C.

Rectification/improvement was observed during the follow-up audit session on 24 December 2013.

24/12/2013

Properly cover the stockpiles of soil at Portion C.

Rectification/improvement was observed during the follow-up audit session on 31 December 2013.

Noise

31/12/2013

Provide acoustic decoupling measures for the air compressor at P77.

Rectification/improvement was observed during the follow-up audit session on 7 January 2014

Waste / Chemical Management

03/12/2013

Provide drip tray for the chemical containers at Portion C.

Rectification/improvement was observed during the follow-up audit session on 12 November 2013.

03/12/2013

Clear the accumulated wastes at the waste skip at Portion C.

Rectification/improvement was observed during the follow-up audit session on 10 December 2013.

10/12/2013

To plug the hole of drip tray at P42.

Rectification/improvement was observed during the follow-up audit session on 17 December 2013.

10/12/2013

The empty chemical containers should be disposed separately as chemical waste at P47.

Rectification/improvement was observed during the follow-up audit session on 17 December 2013.

17/12/2013

Clear the oil spillage at near the temporary drain at Portion C.

Rectification/improvement was observed during the follow-up audit session on 24 December 2013.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

03/12/2013

To replace the incomplete environmental permit at Portion C.

Rectification/improvement was observed during the follow-up audit session on 10 December 2013.

Other

31/12/2013

To replace the damage banner which indicate the type of marine sediment of the barge (B22338Y).

Rectification/improvement was observed during the follow-up audit session on 7 January 2014

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

30/12/2013

N/A(1)

N/A(1)

Remark:      N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.