8.1
Summary
of exceedance is provided in Appendix L.
8.2
No
Action/Limit Level exceedance was recorded for air
quality (1-hr TSP) and construction noise.
8.3
For 24-hour
TSP monitoring, no Limit Level exceedance was
recorded. Two Action Level exceedances were recorded
at AMS1 on 10 and 27 December 2013.
8.4
According
to the investigation, no dust generation works was conducted at near the
monitoring station during the monitoring and observable dust source from
construction activity under Contract No. HY/2011/09. In addition, construction
works from other site and stockpile of dusty materials without proper cover at
near the monitoring station was observed. Therefore, the exceedance is considered not due to the Contract.
8.5
All
water quality monitoring was conducted as scheduled in the reporting month.
There are twenty-four Action Level and twelve Limit Level exceedances
for suspended solids were recorded. In addition, there are four Action Level
and six Limit Level exceedances for turbidity were
recorded.
8.6
According
to the investigation, no pollution discharge was observed from the site. In
addition, sediment plume discharging to the monitoring stations from the area
outside the site boundary and localized plume in the monitoring area were
observed. Therefore, the exceedances are considered
not due to the Contract.
8.7
No environmental
related complaint was received in the reporting month. The Complaint Log is
attached in Appendix P.
8.8
There
was no prosecution or notification of summons received since the Contract
commencement.