2               Contract INFORMATION

Background

2.1         The proposed Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road (HKLR) is 12km long connecting the Hong Kong-Zhuhai-Macao Bridge (HZMB) at the HKSAR Boundary with the Hong Kong Boundary Crossing Facilities (HKBCF) situated at the north eastern waters of the Hong Kong International Airport, opening a new and direct connection route between Hong Kong, Macao and the Western Pearl River Delta. 

2.2         The HKLR comprises a 9.4km long viaduct section from the HKSAR boundary to Scenic Hill on the Airport Island; a 1km tunnel section to the reclamation formed along the east coast of the Airport Island and a 1.6km long at-grade road section on the reclamation connecting to the HKBCF. The tunnel section of HKLR will pass under Scenic Hill, Airport Road and Airport Railway to minimize the environmental and visual impacts to Tung Chung residents.

2.3         An application (No ESB-110/2003) for an Environmental Impact Assessment (EIA) Study Brief under Section 5(1) of the Environmental Impact Assessment Ordinance (EIAO) was submitted by Highways Department (the Project Proponent) on 8 October 2003 with a Project Profile (No. No. PP-201/2003) for the Hong Kong - Zhuhai - Macao Bridge Hong Kong Section and North Lantau Highway Connection. The Hong Kong - Zhuhai - Macao Bridge Hong Kong Section and North Lantau Highway Connection has subsequently been renamed as HKLR.  EPD issued an EIA Study Brief (No: ESB-110/2003) in November 2003 to the Project Proponent to carry out an EIA study.

2.4         An EIA Study (Reg. No. AEIAR-144/2009) has been undertaken to provide information on nature and extent of environmental impacts arising from the construction and operation of HKLR. The Environmental Permit was issued on 4 November 2009 (Permit No. EP-352/2009). Pursuant to Section 13 of the EIAO, the Director of Environmental Protection amends the Environmental Permit (No. EP-352/2009) based on the Application No. VEP-339/2011 and the environmental Permit (Permit No. EP-352/2009/A) was issued on 9 November 2011 for HKLR to the Highways Department as the Permit Holder. Subsequently, the Director of Environmental Protection amends the Environmental Permits (No. EP-352/2009/A and EP-352/2009/B) based on the Application No. VEP-409/2013 and VEP-411/2013 respectively. The environmental Permit (Permit No. EP-352/2009/C) was then issued on 5 September 2013.

2.5         Figure 1a-d  shows the layout of the Contract and the scope of the Contract works comprises the following major items:

 

·           a dual 3-lane carriageway in the form of viaduct from the HKSAR boundary (connecting with the HZMB Main Bridge) to the Scenic Hill (connecting with the tunnel under separate Contract No. HY/2011/03), of approximately 9.4km in length with a hard shoulder for each bound of carriageway and a utilities trough on the outer edge of each bound of viaducts;

·           a grade-separated turnaround facility located near San Shek Wan, composed of sliproads in the form of viaduct with single-lane carriageway bifurcated from the HKLR mainline with an elevated junction above the mainline;

·           provision of ancillary facilities including, but not limited to, meteorological enhancement measures including the provisioning of anemometers and modification of the wind profiler station at hillside of Sha Lo Wan, provisioning of a compensatory marine radar, and provisioning of security systems; and

·           associated civil, structural, geotechnical, marine, environmental protection, landscaping, drainage and highways electrical and mechanical (E&M) works, street lightings, traffic aids and sign gantries, marine navigational aids, ship impact protection system, water mains and fire hydrants, lightning protection system, structural health monitoring and maintenance management system (SHM&MMS), supervisory control and data acquisition (SCADA) system, as well as operation and maintenance provisions of viaducts, provisioning of facilities for installation of traffic control and surveillance system (TCSS), provisioning of facilities for installation of telecommunication cables/equipments and reprovisioning works of affected existing facilities/utilities.

Contract Organisation

2.6         Different parties with different levels of involvement in the Contract organization include:

Ÿ   Supervising Officer’s Representative (SOR) – Ove Arup & Partners Hong Kong Limited (ARUP)

Ÿ   Contractor –Dragages -China Harbour-VSL JV   (DCVJV)

Ÿ   Environmental Team (ET) – Cinotech Consultants Ltd. (Cinotech)

 

2.7         The proposed project organization and lines of communication with respect to the on-site environmental management structure are shown in Figure 2. The key personnel contact names and numbers are summarized in Table 2.1.

Table 2.1        Key Contacts of the Contract

Party

Position

Position

Phone No.

Fax No.

SOR (ARUP)

CRE

Mr. Michael Chan

3767 5803

3767 5922

Mr. Colin Meadows

3767 5801

ENPO/IEC

(Environ)

Environmental Project Office Leader

Mr. Y. H Hui

3465 2888

3465 2899

Independent Environmental Checker

Mr. Antony Wong

3465 2888

3465 2899

Contractor (DCVJV)

Deputy Project Director

Mr. W.K Poon

3121 6638

3121 6688

Environmental Officer

Mr. CHU Chung Sing

3121 6672

24-hour Hotline

--

6898 6161

--

ET

(Cinotech)

Environmental Team Leader

Dr. H.F Chan

2151 2088

3107 1388

 

2.8         ENVIRON Hong Kong Ltd. (Environ) is employed by the Highways Department as the Independent Environmental Checker (IEC) and Environmental Project Office (ENPO) for the Project.

Construction Programme

 

2.9         A copy of Contractor’s construction programme is provided in Appendix A.

Summary of Construction Works Undertaken During Reporting Month

2.10     The major site activities undertaken in the reporting month included:

Land Viaduct (P84 to Eastern Abutment at SHT) and Preparation Works

(a)    All  land  piling  machines  are  carrying  out  piling  works  in  Portion  A  due  to pending  the  completion  of  diversion  of  existing  drainage  &  watermain  and the commencement of COM cable of AA division in Portion C;

(b)  P114 area site formation for piling works was completed. Pile P114R was excavated to rock head and drilling of rock socket is in progress;

(c)  AA  COM  cable  slewing  was  completed  and  backfilled.  Piling equipment for Pile P113C was mobilized on site and pile excavation started;

(d) 27 pours of column were completed with 9 pours in this reporting period;

(e)  Rebar threading for coupler continues in Portion C;

(f)  AAHK’s  permit  for  the  construction  of  the  carriageway  diversion  and formations of piling platform at P82 & P83 is still pending for approval;

(g)  Tree transplanting was completed and its maintenance works are on-going.

(h) Drainage diversion works remains in progress.  Most pipes were laid except some pipes at manhole connection. MH2, MH3 & MH4 were completed. Backfilling was partially completed;

(i)  Waling  of  ELS for pile  cap  construction  at P111 L  & R  and  P112  L  &  R were removed upon completion of pile cap and backfilled up to the top level of the pile cap.

(j)  The  erection  of the  supporting false work  (brackets  and  main  carrier  beams) for  the   portal  beam  construction  at  P109  was  completed.  Erection of side formwork for the portal and kickers are in progress;

(k)  Formation work for Portal P110 was in progress.

Marine Viaduct (P0 to P84)

RCD Method:

(a)  Construction of temporary jetty for piling works atP68 is in progress;

(b)  Piling jackets were installed at P14R, P56L, P57L, P76R;

(c)  Permanent casings were installed at P14R, P55R, P56L, P59L, P59R & P77R;

(d)  Pile excavations are in progress at P14, P22, P55, P56, P57, P59, P72 & P77;

(e)  Piling jackets were dismantled at P14L, P55R, P57R & P73L;

(f)  Inter-face coring tests were carried out at P46, P50, P51, P65, P66 & P73;

(g)  No Full depth coring tests was carried out in this reporting period;

(h)  Sonic tests were carried out at P46, P50, P65 & P73;

(i)  Grouting works were carried out at P46 & P73;

Kelly Method:

(j)  Installation of temporary piles were carried out atP16 (friction test pile), P17, P18, P32, P33, P34, P35 & P36;

(k)  Installation of platforms were carried out at P16, P17, P18, P35 & P36;

(l)   Installation of permanent casing were carried out at P16, P18, P35 & P36;

(m) Piling  platform  removal  and  temporary  pile  extraction  were  carried  out  at P20, P38, P40 & P44;

(n)  Pile excavation by Kelly method are in progress at P16, P18, P19, P37 & P39;

(o)  Trial water cracking and trial shaft grouting at P18-L5 was completed;

(p)  Inter-face core test were carried out at P20, P37, P42, P45 & P49;

(q)  Sonic tests were carried out at P20, P44 & P49.

Pilecap Construction:

(r)  P0-L&R precast shells waterproofing works and stage one reinforced concrete works was completed. Stage two reinforced concrete works is in progress. Casting is scheduled to complete before end of January 2014;

(s) Installation of precast shells at P47 and P48 were completed. Waterproofing and stage 1 reinforced concrete works is in progress;

(t)  Preparation  work  for  the  installation  of  the  precast  shells  for  pilecap construction at P46 is in progress;

(u)  Advanced concrete breaking works inside the permanent steel casing at P20 and P44 has commenced;

(v)  Works with cofferdam: Driving of sheet piling at P74 was carried out; driving of sheet piling at P71 was commenced.

Precast Segment

(w) Progress of the precast concrete segment casting yard:

-  Test and commissioning of the two load-out jetties are in progress;

- All gantries in total of 18 nos. were erected. 7 nos. gantries were tested and commissioned and the remaining 11 nos. gantries areunder processing;

-  Mould fabrications for 1 no. Type B, 10 nos. Type A(including 2 no. SOP’s), 2 nos. Type D, 1 no. Type DT, 4 nos. Type E, and 1 no. Type CH2 (long spans) were assembled. Other Type CH and Type CP mould fabrication continues at the casting yard;

-  Rebar  jigs  fabrication  and  installation  continues  with  18  of  30  nos. completed;

-  Rebar and PT material delivery continues;

-  A total of 13 segments were cast in this reporting period and up to end of the reporting period total 169 segments cast.

Precast Concrete Shell Casting and Installation

(x)    3 nos. (cumulative 10 nos.) of CP1 precast shells and 1 no. (cumulative 1 no.) of CP4 precast shell were cast in precast yard.

Status of Environmental Licences, Notification and Permits

 

2.11     A summary of the relevant permits, licences, and/or notifications on environmental protection for this Contract is presented in Table 2.2.

 

Table 2.2        Status of Environmental Licences, Notification and Permits

 

Permit / License No.

Valid Period

Status

From

To

Environmental Permit (EP)

EP-352/2009/C

05/09/2013

N/A

Valid

Consruction Noise Permit (CNP)

WA7: GW-RW0484-13

15/07/2013(23:00)

14/01/2014(07:00)

Expired

WA4: GW-RW0496-13

19/07/2013(19:00)

18/01/2014(23:00)

Expired

P65-P66:GW-RS0865-13

02/08/2013(23:00)

01/02/2014(07:00)

Cancelled on 14/01/2014

P76-P80:GW-RS0868-13

02/08/2013(23:00)

01/02/2014(07:00)

Valid

P69-P70:GW-RS0869-13

02/08/2013(23:00)

01/02/2014(07:00)

Cancelled on 14/01/2014

WA7:GW-RW0524-13

27/08/2013(19:00)

27/02/2014(23:00)

Valid

WA4B:GW-RW0550-13

12/08/2013(23:00)

11/02/2014(07:00)

Valid

P69-P70: GW-RS0976-13

16/09/2013(19:00)

15/03/2014(23:00)

Valid

P76-P80: GW-RS0981-13

30/08/2013(19:00)

28/02/2014(23:00)

Valid

P83: GW-RS0956-13

24/08/2013(19:00)

23/02/2014(24:00)

Valid

P46-P64: GW-RS0970-13

27/08/2013(23:00)

26/02/2014(07:00)

Cancelled on 14/01/2014

P85-P87 and P103-P113:

GW-RS0994-13

02/09/2013(19:00)

01/03/2014(23:00)

Valid

P0 – P21: GW-RS1108-13

07/10/2013 (23:00)

06/04/2014 (07:00)

Cancelled on 14/01/2014

P88 – P102: GW-RS1116-13

08/10/2013 (19:00)

06/04/2014 (23:00)

Valid

P81 – P82: GW-RS1143-13

11/10/2013 (19:00)

10/04/2014 (24:00)

Valid

P71 – P74: GW-RS1221-13

31/10/2013(19:00)

28/04/2014(23:00)

Valid

P71 – P74: GW-RS1217-13

30/10/2013(23:00)

29/04/2014(07:00)

Valid

P101 – P113: GW-RS1322-13

30/11/2013(19:00)

30/01/2014(23:00)

Valid

P101 – P113: GW-RS1314-13

01/12/2013 (00:00)

31/01/2014 (06:30)

Valid

P1 – P68: GW-RS1415-13

11/12/2013 (19:00)

03/06/2014 (23:00)

Cancelled on 14/01/2014

Waters in Works Area Portion A:

GW-RS1416-13

11/12/2013 (19:00)

22/02/2014 (23:00)

Valid

WA7: GW-RW0960-13

14/01/2014 (23:00)

13/06/2014 (07:00)

Valid

WA4: GW-RW0006-14

19/01/2014(19:00)

18/07/2014 (23:00)

Valid

P0 – P68: GW-RS0029-14

14/01/2014 (19:00)

13/03/2014 (23:00)

Valid

P0    P28  and  P57    67:

GW-RS0026-14

14/01/2014(23:00)

05/07/2014(07:00)

Valid

Notification pursuant to Air Pollution Control (Construction Dust) Regulation

345773

04/06/2012

N/A

Receipt acknowledged by EPD

Billing Account for Construction Waste Disposal

A/C# 7015341

(Construction Site)

11/06/2012

N/A

Valid

A/C# 7016948      

(Vessel Disposal)

01/12/2013

28/02/2014

Valid

Registration of Chemical Waste Producer

WPN 5213-951-D2499-01

18/07/2012

N/A

Valid

Effluent Discharge License under Water Pollution Control Ordinance

WA6A(DCVJV site office): WT00014053-2012

12/09/2012

30/09/2017

Valid

WA6B  (SOR site office): WT00014447-2012

30/10/2012

31/10/2017

Valid

WA3: WT00015118-2013

30/01/2013

31/01/2018

Valid

Portion C: WT00015356-2013

22/02/2013

28/02/2018

Valid

Portion A: WT00016076-2013

21/05/2013

31/05/2018

Valid

WA4B: WT00014750-2012

12/08/2013

31/08/2018

Valid

Marine Dumping Permit

Dumping of Phase 1, 2a, 2b, 2c and 2d (Type 1-Open Sea Disposal) marine sediment

EP/MD/14-043

05/08/2013

04/02/2014

Valid

Dumping of Phase 1, 2a, 2b, 2c and 2d

(Type 1D and Type 2) marine sediment

EP/MD/14-099

07/12/2013

06/01/2014

Expired

Dumping of Category L and M) marine sediment

EP/MD/14-090

03/01/2014

18/01/2014

Expired

Dumping of Phase 1, 2a, 2b, 2c and 2d

(Type 1D and Type 2) marine sediment

EP/MD/14-113

10/01/2014

09/02/2014

Valid