8.1
Summary
of exceedance is provided in Appendix L.
8.2
No
Action/Limit Level exceedance was recorded for air
quality (1-hr TSP) and construction noise.
8.3
For 24-hour
TSP monitoring, no Limit Level exceedance was
recorded. One Action Level exceedance was recorded at
AMS1 on 17 February 2014.
8.4
According
to the investigation, no dust generation works was conducted at near the
monitoring station during the monitoring and observable dust source from
construction activity under Contract No. HY/2011/09. In addition, construction
works from other site and stockpile of dusty materials without proper cover at near
the monitoring station was observed. Therefore, the exceedance is considered not due to the Contract.
8.5
All
water quality monitoring was conducted as scheduled in the reporting month. There are nine Action Level and three Limit Level exceedances for suspended solids were recorded. No exceedances for dissolved oxygen and turbidity were
recorded.
8.6
According
to the investigation, no pollution discharge was observed from the site. In
addition, sediment plume due to natural fluctuation of shallow water was observed
and the exceeded results were similar or within the ranges baseline monitoring
results. Therefore, the exceedances are considered
not due to the Contract.
8.7
No environmental
related complaints were received in the reporting month. The Complaint Log is
attached in Appendix P.
8.8
There
was no prosecution or notification of summons received since the Contract
commencement.