Table 7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
11/03/2014 |
Clear the waste materials and debris at the barge
at P28. |
Rectification/improvement
was observed during the follow-up audit session on 18 March 2014. |
11/03/2014 |
Provide mitigation measures to avoid the leakage
of muddy water to the sea at platform at P28. |
Rectification/improvement
was observed during the follow-up audit session on 18 March 2014. |
|
18/03/2014 |
Properly deploy the silt curtain at P106
and P98. |
Rectification/improvement
was observed during the follow-up audit session on 28 March 2014. |
|
28/03/2014 |
Properly store the construction material to
avoid it getting to the sea at P48. |
Rectification/improvement
was observed during the follow-up audit session on 1 April 2014. |
|
Ecology |
N/A(1) |
N/A(1) |
N/A(1) |
Air Quality |
N/A(1) |
N/A(1) |
N/A(1) |
Noise |
28/03/2014 |
Provide
noise emission labels for the breaker and air compressor at P39. |
Rectification/improvement
was observed during the follow-up audit session on 1 April 2014. |
Waste /
Chemical Management |
05/03/2014 |
To clear and avoid the oil leakage from the
equipment to the unpaved area at WA7. |
Rectification/improvement
was observed during the follow-up audit session on 11 March 2014. |
05/03/2014 |
Clear the wastes at the drainage channel at WA7. |
Rectification/improvement
was observed during the follow-up audit session on 11 March 2014. |
|
11/03/2014 |
To seal the hole of the drip tray at P75. |
Rectification/improvement
was observed during the follow-up audit session on 18 March 2014. |
|
18/03/2014 |
Clear the
general refuse at construction sites near the containers and site entrance of
Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 28 March 2014. |
|
18/03/2014 |
To plug the hole of drip tray at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 28 March 2014. |
|
18/03/2014 |
Provide drip tray for the oil container at
P101. |
Rectification/improvement
was observed during the follow-up audit session on 28 March 2014. |
|
28/03/2014 |
Clear and avoid
oil leakage from the pump for diesel oil at P39. |
Rectification/improvement
was observed during the follow-up audit session on 1 April 2014. |
|
28/03/2014 |
Provide drip tray for the oil containers at
the barge of P48. |
Rectification/improvement
was observed during the follow-up audit session on 1 April 2014. |
|
Landscape
& Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
18/03/2014 |
To update the CNP which displays at the
site entrance of Portion C |
Rectification/improvement
was observed during the follow-up audit session on 28 March 2014. |
Other |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural Heritage (Sha Lo Wan (West)
Archaeological Site) |
21/03/2014 |
N/A(1) |
N/A(1) |
Remark: N/A(1) - No major environmental
deficiency was identified during the site inspection in the reporting month.