1.1
Cinotech
Consultants Limited (Cinotech) was appointed by Dragages -China Harbour-VSL JV (hereinafter
called “the Contractor”) as the
Environmental Team (ET) to undertake the Environmental Monitoring and Audit
(EM&A) programme during construction phase of the
Contract No. HY/2011/09 – Hong Kong-Zhuhai-Macao
Bridge Hong Kong Link Road – Section between HKSAR Boundary and Scenic Hill”
(hereinafter called the “Contract”) in
accordance with EP Conditions 2.1.
1.2
This is
the 15th EM&A report which summarises
the impact monitoring results and audit findings for the EM&A programme in April 2014.
1.3
The
structure of the report is as follows:
Section 1: Introduction - purpose and structure of
the report.
Section 2: Contract Information - summarises background and scope of the Contract, site
description, project organization and contact details, construction programme, the construction works undertaken and the status
of Environmental Permits/Licenses during the reporting month.
Section 3: Air Quality Monitoring - summarises the monitoring parameters, monitoring programmes, monitoring methodologies, monitoring frequency,
monitoring locations, Action and Limit Levels, monitoring results and Event /
Action Plans.
Section 4: Noise Monitoring - summarises
the monitoring parameters, monitoring programmes,
monitoring methodologies, monitoring frequency, monitoring locations, Action
and Limit Levels, monitoring results and Event / Action Plans.
Section 5: Water Quality Monitoring - summarises the monitoring parameters, monitoring programmes, monitoring methodologies, monitoring frequency,
monitoring locations, Action and Limit Levels, monitoring results and Event /
Action Plans.
Section 6: Dolphin-Related
Monitoring - summarises the monitoring
parameters, monitoring programmes, monitoring
methodologies, monitoring frequency, monitoring locations and monitoring
results.
Section 7: Environmental Site Inspection - summarises the audit findings of the weekly site
inspections undertaken within the reporting month.
Section 8: Environmental Non-conformance - summarises any monitoring exceedance,
environmental complaints, environmental summons and successful prosecutions
within the reporting month.
Section 9: Future Key Issues - summarises the impact forecast and monitoring schedule for
the next three months.
Section 10: Conclusions and Recommendation