Table 7.1           Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

07/05/2014

Silt curtain has observed damage and not deployed properly at near P106 and P107. The Contractor was reminded to replace the damage silt curtain as soon as possible.

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

13/05/2014

Clear the deposited soil at the public road at near P107. (Portion C)

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

13/05/2014

Properly deploy the silt curtain to ensure it function effectively at P106, P107, P98 and P101.

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

13/05/2014

Clear the floating wastes within the silt curtain at P101.

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

20/05/2014

To check the silt curtain and avoid the gap at the silt curtain at P68.

Rectification/improvement was observed during the follow-up audit session on 30 May 2014.

20/05/2014

Clear the deposited waste materials at the platform at P73.

Rectification/improvement was observed during the follow-up audit session on 30 May 2014.

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

07/05/2014

Clear the soil at the public road at Portion C.

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

13/05/2014

Clear the deposited soil at the public road at near P107. (Portion C)

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

30/05/2014

Dust generation was observed from the trimming works at P45. The Contractor was reminded to provide sufficient dust mitigation measures properly.

Rectification/improvement was observed during the follow-up audit session on 3 June 2014.

Noise

13/05/2014

Provide noise emission labels for the hand-held breaker at P94.

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

30/05/2014

To close the panel of air compressor at P45.

Rectification/improvement was observed during the follow-up audit session on 3 June 2014.

30/05/2014

To check and provide noise emission label for the hand-held breakers at P45.

Rectification/improvement was observed during the follow-up audit session on 3 June 2014.

Waste / Chemical Management

07/05/2014

Clear the oil spillage at the site entrance of Portion C.

Rectification/improvement was observed during the follow-up audit session on 13 May 2014.

07/05/2014

To remove the construction materials and provide fencing for protecting the trees at Portion A and C.

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

13/05/2014

To seal the hole of drip tray and review the size of drip tray for placing the oil pump at near P108 (Portion C).

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

13/05/2014

Clear the accumulated waste at the waste skip at near P107. (Portion C)

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

13/05/2014

To remove the construction materials at near the tree and provide tree protection zone at P105 and P106.

Rectification/improvement was observed during the follow-up audit session on 20 May 2014.

20/05/2014

Clear the accumulated wastes at barge of P47.

Rectification/improvement was observed during the follow-up audit session on 30 May 2014.

30/05/2014

Clear the waste materials at the platform at P72.

Rectification/improvement was observed during the follow-up audit session on 3 June 2014.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

N/A(1)

N/A(1)

N/A(1)

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

N/A(2)

N/A(2)

N/A(2)

Remark:   N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.

N/A(2) No archaeological site inspection was conducted in the reporting month.