Table 7.1           Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

02/07/2014

Properly deploy the silt curtain at P99 and P98.

The item was not rectified during the follow-up audit session and re-recorded on 8 July 2014. Rectification/improvement was observed on 17 July 2014.

02/07/2014

Clear the waste materials within the silt curtain at P90.

Rectification/improvement was observed during the follow-up audit session on 8 July 2014.

08/07/2014

The muddy water was observed discharging to the public road and gully at S8 OUT. The Contractor was reminded to rectify it ASAP.

Rectification/improvement was observed during the follow-up audit session on 17 July 2014.

08/07/2014

To check the designated discharging point in the wastewater discharge license at Portion C.

Rectification/improvement was observed during the follow-up audit session on 17 July 2014.

08/07/2014

Clear the discarded silt curtain at seawall area at P104.

Rectification/improvement was observed during the follow-up audit session on 17 July 2014.

08/07/2014

Properly deploy the silt curtain at P101, P98 and P90.

Rectification/improvement was observed during the follow-up audit session on 17 July 2014.

17/07/2014

Broken silt curtain was observed at P26. The Contractor was reminded to clear the damage part and re-deploy the silt curtain accordingly.

Rectification/improvement was observed during the follow-up audit session on 25 July 2014.

17/07/2014

Clear the residual marine mud at the barge near P2.

Rectification/improvement was observed during the follow-up audit session on 25 July 2014.

25/07/2014

Provide silt curtain to surround the cofferdam at P72.

Rectification/improvement was observed during the follow-up audit session on 29 July 2014.

25/07/2014

To repair the damage silt curtain at P16.

Rectification/improvement was observed during the follow-up audit session on 29 July 2014.

29/07/2014

Properly deploy the silt curtain at P19.

Rectification/improvement was observed during the follow-up audit session on 6 August 2014.

29/07/2014

Clear the accumulated broken concrete materials regularly and avoid disposing these materials into the sea at P61.

Rectification/improvement was observed during the follow-up audit session on 6 August 2014.

Ecology

02/07/2014

Remove the construction materials / wastes at near the trees at Portion C, P101, P99 and P88.

The item was not rectified during the follow-up audit session and re-recorded on 8 July 2014. Rectification/improvement was observed on 17 July 2014.

08/07/2014

To avoid the disturbance on trees at Portion C.

Rectification/improvement was observed during the follow-up audit session on 17 July 2014.

08/07/2014

Remove the construction materials at near the trees at Portion C, P88 and P101.

Rectification/improvement was observed during the follow-up audit session on 17 July 2014.

Air Quality

08/07/2014

Provide dust mitigation measures for the stockpile of soil at P84.

Rectification/improvement was observed during the follow-up audit session on 17 July 2014.

Noise

29/07/2014

Provide acoustic decoupling measure for the water pump at the barge near P19.

Rectification/improvement was observed during the follow-up audit session on 6 August 2014.

29/07/2014

Provide noise emission labels for the hand-held breaker at P61.

Rectification/improvement was observed during the follow-up audit session on 6 August 2014.

Waste / Chemical Management

08/07/2014

Clear the general refuse at near office container at Portion C.

Rectification/improvement was observed during the follow-up audit session on 17 July 2014.

08/07/2014

Clear the oil leakage and provide drip tray for the oil container at Portion C.

Rectification/improvement was observed during the follow-up audit session on 17 July 2014.

17/07/2014

Clear the oil spillage at the barge near P2.

Rectification/improvement was observed during the follow-up audit session on 25 July 2014.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

17/07/2014

To display the environmental permit and construction noise permit, if any at P2 and P26.

Rectification/improvement was observed during the follow-up audit session on 25 July 2014.

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

N/A(2)

N/A(2)

N/A(2)

Remark:   N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.

N/A(2) No archaeological site inspection was conducted in the reporting month.