8.1
Summary
of exceedance is provided in Appendix L.
8.2
No
Action/Limit Level exceedance was recorded for air
quality and construction noise.
8.3
All
water quality monitoring was conducted as scheduled in the reporting month. There
are four Action Level and one Limit Level exceedances for suspended solids were recorded. No
Action/Limit Level exceedance for dissolved oxygen
and turbidity were recorded.
8.4
According
to the investigation, no pollution discharge was observed from the site and no
marine construction works were conducted in vicinity of monitoring station in
which exceedance was recorded. In addition, sediment
plume due to natural fluctuation of shallow water was observed. Therefore, the exceedances are considered not due to the Contract.
8.5
No environmental
related complaint was received in the reporting month. The Complaint Log is
attached in Appendix P.
8.6
There
was no prosecution or notification of summons received since the Contract commencement.