8               ENVIRONMENTAL NON-CONFORMANCE (EXCEEDANCES)

Summary of Exceedances

 

8.1         Summary of exceedance is provided in Appendix L.

8.2         No Action/Limit Level exceedance was recorded for air quality and construction noise.

8.3         All water quality monitoring was conducted as scheduled in the reporting month except the water quality monitoring on 16 September 2014 during mid-ebb tide which was cancelled due to adverse weather condition (Typhoon Signal No.3). There are eleven Action Level and thirteen Limit Level exceedances for suspended solids were recorded. No Action/Limit Level exceedance for dissolved oxygen and turbidity were recorded.

 

8.4         According to the investigation, the exceedances are considered not due to the Contract due to the following reasons:

 

1)      No pollution discharge was observed from the site;

2)      The sea conditions were rough. Localized plumes due to natural fluctuation were observed in the monitoring area;

3)      Sediment plume due to natural fluctuation of shallow water and movement of vessel;

4)      Sediment plume discharging to the monitoring stations from the area outside the site boundary;

5)      Adverse water quality outside the site boundary; and

6)      The major marine construction works (e.g. bored piling works) has not been commenced.

Summary of Environmental Complaint

 

8.5         No environmental related complaint was received in the reporting month. The Complaint Log is attached in Appendix P.

Summary of Notification of Summons and Successful Prosecution

8.6         There was no prosecution or notification of summons received since the Contract commencement.