8               ENVIRONMENTAL NON-CONFORMANCE (EXCEEDANCES)

Summary of Exceedances

 

8.1         Summary of exceedance is provided in Appendix L.

8.2         No Action/Limit Level exceedance was recorded for air quality and construction noise.

8.3         All water quality monitoring was conducted as scheduled in the reporting month. There are two Action Level and no Limit Level exceedances for suspended solids were recorded. No Action/Limit Level exceedance for dissolved oxygen and turbidity were recorded.

 

8.4         According to the investigation, the exceedances are considered not due to the Contract as localized red tides have been sighted during water quality monitoring on 28 November 2014 in which exceedances were recorded.

Summary of Environmental Complaint

 

8.5         Three environmental related complaints were received in the reporting month. The Complaint Log is attached in Appendix P.

Summary of Notification of Summons and Successful Prosecution

8.6         There was one prosecution or notification of summons received since the Contract commencement. Summary of successful prosecution as attached in Appendix Q.