8.1
Summary of exceedance is provided in Appendix L.
8.2
No Action/Limit Level exceedance was recorded for air quality and construction
noise.
8.3
All water quality monitoring was conducted as
scheduled in the reporting month. There are two Action Level and no Limit
Level exceedances for suspended solids were recorded. No Action/Limit Level exceedance
for dissolved oxygen and turbidity were recorded.
8.4
According to the investigation, the exceedances are considered not due
to the Contract as localized red tides have been sighted
during water quality monitoring on 28 November 2014 in which exceedances were
recorded.
8.5
Three environmental related complaints were received in the reporting month.
The Complaint Log is attached in Appendix
P.
8.6
There was one prosecution or notification of summons received since the Contract
commencement. Summary of successful prosecution as attached in Appendix Q.