Table 7.1       Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

03/02/2015

To repair the damage part of silt curtain at P91.

Rectification/improvement was observed during the follow-up audit session on 10 February 2015.

10/02/2015

A sedimentation tank with connecting tube was placed at seawall area at P86. The Contractor was reminded to check the approved discharging location according to wastewater discharge license before discharging the treated muddy water.

Rectification/improvement was observed during the follow-up audit session on 18 February 2015.

10/02/2015

Wastewater was observed pumping out to the gully directly at P82. The Contractor was reminded to provide sedimentation facilities and discharge the treated wastewater to approved discharging location.

Rectification/improvement was observed during the follow-up audit session on 18 February 2015.

10/02/2015

Muddy water generated from bored piling works and accumulated at P82. The Contractor was reminded to pump the muddy water to the sedimentation tank and discharge to approved discharging location.

Rectification/improvement was observed during the follow-up audit session on 18 February 2015.

24/02/2015

Clear the excess concrete debris at the platform at P15.

Rectification/improvement was observed during the follow-up audit session on 3 March 2015.

Ecology

03/02/2015

Clear the construction materials at near the trees at P100.

Rectification/improvement was observed during the follow-up audit session on 10 February 2015.

03/02/2015

To remove the generator at near the tree at P96.

Rectification/improvement was observed during the follow-up audit session on 10 February 2015.

10/02/2015

Clear the construction materials at near the trees at P91.

Rectification/improvement was observed during the follow-up audit session on 24 February 2015.

Air Quality

N/A(1)

N/A(1)

N/A(1)

Noise

10/02/2015

Provide noise emission label for the air compressor at P81.

Rectification/improvement was observed during the follow-up audit session on 24 February 2015.

10/02/2015

Properly close the door panel of air compressor at P81.

Rectification/improvement was observed during the follow-up audit session on 24 February 2015.

24/02/2015

Provide noise emission labels for the hand held breaker at the platform at P15.

Rectification/improvement was observed during the follow-up audit session on 3 March 2015.

Waste / Chemical Management

03/02/2015

Clear the accumulated wooden wastes and aluminum cans at between P100 and P99.

Rectification/improvement was observed during the follow-up audit session on 10 February 2015.

10/02/2015

Clear the construction wastes and handrail at the seawall area at P84.

 

Rectification/improvement was observed during the follow-up audit session on 24 February 2015.

18/02/2015

Clear the wastes materials at the temporary drainage channel at near P112.

Rectification/improvement was observed during the follow-up audit session on 24 February 2015.

18/02/2015

Clear the accumulated general refuse at near P108.

Rectification/improvement was observed during the follow-up audit session on 24 February 2015.

24/02/2015

Regular clear the waste materials at the platform at P19.

Rectification/improvement was observed during the follow-up audit session on 3 March 2015.

24/02/2015

Clear the wastewater which is nearly overflow at the drip tray at P19.

Rectification/improvement was observed during the follow-up audit session on 3 March 2015.

24/02/2015

Clear the oil spillage around the drip tray at P19.

Rectification/improvement was observed during the follow-up audit session on 3 March 2015.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

N/A(1)

N/A(1)

N/A(1)

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

N/A(2)

N/A(2)

N/A(2)

Remark:       N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.

N/A(2) No archaeological site inspection was conducted in the reporting month.