Table 7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
03/02/2015 |
To repair the damage part of silt curtain at P91. |
Rectification/improvement
was observed during the follow-up audit session on 10 February 2015. |
10/02/2015 |
A sedimentation tank with connecting tube was
placed at seawall area at P86. The Contractor was reminded to check the
approved discharging location according to wastewater discharge license
before discharging the treated muddy water. |
Rectification/improvement
was observed during the follow-up audit session on 18 February 2015. |
|
10/02/2015 |
Wastewater was observed pumping out to the gully
directly at P82. The Contractor was reminded to provide sedimentation
facilities and discharge the treated wastewater to approved discharging
location. |
Rectification/improvement
was observed during the follow-up audit session on 18 February 2015. |
|
10/02/2015 |
Muddy water generated from bored piling works and
accumulated at P82. The Contractor was reminded to pump the muddy water to
the sedimentation tank and discharge to approved discharging location. |
Rectification/improvement
was observed during the follow-up audit session on 18 February 2015. |
|
24/02/2015 |
Clear the excess concrete debris at the platform
at P15. |
Rectification/improvement
was observed during the follow-up audit session on 3 March 2015. |
|
Ecology |
03/02/2015 |
Clear the construction materials at near
the trees at P100. |
Rectification/improvement
was observed during the follow-up audit session on 10 February 2015. |
03/02/2015 |
To remove the generator at near the tree at
P96. |
Rectification/improvement
was observed during the follow-up audit session on 10 February 2015. |
|
10/02/2015 |
Clear
the construction materials at near the trees at P91. |
Rectification/improvement
was observed during the follow-up audit session on 24 February 2015. |
|
Air Quality |
N/A(1) |
N/A(1) |
N/A(1) |
Noise |
10/02/2015 |
Provide noise emission label for the air
compressor at P81. |
Rectification/improvement
was observed during the follow-up audit session on 24 February 2015. |
10/02/2015 |
Properly close the door panel of air
compressor at P81. |
Rectification/improvement
was observed during the follow-up audit session on 24 February 2015. |
|
24/02/2015 |
Provide noise emission labels for the hand
held breaker at the platform at P15. |
Rectification/improvement
was observed during the follow-up audit session on 3 March 2015. |
|
Waste / Chemical Management |
03/02/2015 |
Clear the accumulated wooden wastes and aluminum cans at between P100 and P99. |
Rectification/improvement
was observed during the follow-up audit session on 10 February 2015. |
10/02/2015 |
Clear
the construction wastes and handrail at the seawall area at P84. |
Rectification/improvement
was observed during the follow-up audit session on 24 February 2015. |
|
18/02/2015 |
Clear the wastes
materials at the temporary drainage channel at near P112. |
Rectification/improvement
was observed during the follow-up audit session on 24 February 2015. |
|
18/02/2015 |
Clear the
accumulated general refuse at near P108. |
Rectification/improvement
was observed during the follow-up audit session on 24 February 2015. |
|
24/02/2015 |
Regular clear the waste materials at the
platform at P19. |
Rectification/improvement
was observed during the follow-up audit session on 3 March 2015. |
|
24/02/2015 |
Clear the wastewater which is nearly
overflow at the drip tray at P19. |
Rectification/improvement
was observed during the follow-up audit session on 3 March 2015. |
|
24/02/2015 |
Clear the oil spillage around the drip tray
at P19. |
Rectification/improvement
was observed during the follow-up audit session on 3 March 2015. |
|
Landscape & Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
N/A(1) |
N/A(1) |
N/A(1) |
Other |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural Heritage (Sha Lo Wan
(West) Archaeological Site) |
N/A(2) |
N/A(2) |
N/A(2) |
Remark: N/A(1) - No major environmental
deficiency was identified during the site inspection in the reporting month.
N/A(2) No archaeological site inspection
was conducted in the reporting month.