8.1
Summary of exceedance is provided in Appendix L.
8.2
No Action/Limit Level exceedance was recorded for air quality (1-hr TSP)
and construction noise.
8.3
For 24-hour TSP monitoring, no Limit Level exceedance was recorded. One
Action Level exceedance was recorded at AMS1 on 11 February 2015.
8.4
According to the investigation, no dust generation works was conducted
at near the monitoring station during the monitoring and observable dust source
from construction activity under Contract No. HY/2011/09. In addition, high and
very high Air Quality Health Index (AQHI) was recorded during the monitoring
period according to EPD. Therefore, the exceedance is considered not due to the
Contract.
8.5
For water quality monitoring, there are four Action Level and no Limit
Level exceedances for suspended solids were recorded. No Action/Limit Level exceedance
for dissolved oxygen and turbidity were recorded.
8.6
According to the investigation, no pollution discharge was observed from
the site. Sediment plume due to natural fluctuation of shallow water and
sediment plume discharging to the monitoring stations from the area outside the
site boundary were observed. Therefore, the exceedances are considered not due
to the Contract.
Summary of Environmental Complaint
8.7
No environmental related complaints were received in the reporting month.
The Complaint Log is attached in Appendix
P.
8.8
There was one prosecution or notification of summons received since the Contract
commencement. Summary of successful prosecution as attached in Appendix Q.