Table 7.1       Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

10/03/2015

The silt curtain at P98 and P95 should be used to surround the works area to avoid the gap.

Rectification/improvement was observed during the follow-up audit session on 17 March 2015.

10/03/2015

Regular check and provide well maintenance for the silt curtain at P68 to ensure it can function properly.

Rectification/improvement was not observed during the follow-up audit session on 17 March 2015. Further follow-up on this item is required.

17/03/2015

To seal the hole at the bunded area at barge (B22595Y) near P29.

Rectification/improvement was observed during the follow-up audit session on 23 March 2015.

17/03/2015

Properly deploy the silt curtain at P72, P99, P86 and P68.

Rectification/improvement was not observed during the follow-up audit session on 23 March 2015. Further follow-up on this item is required.

23/03/2015

The silt curtain at P71 and P70 should be used to surround the works area to avoid the gap.

Rectification/improvement was observed during the follow-up audit session on 31 March 2015.

31/03/2015

Properly deploy the silt curtain at P68, P72, P86, P99 and P103.

Rectification/improvement was not observed during the follow-up audit session on 9 April 2015. Further follow-up on this item is required.

31/03/2015

Clear the waste materials at near the rockfill platform at P68.

Rectification/improvement was observed during the follow-up audit session on 9 April 2015.

31/03/2015

Clear the sedimentation tank to ensure it can function properly at Portion C.

Rectification/improvement was not observed during the follow-up audit session on 9 April 2015. Further follow-up on this item is required.

Ecology

03/03/2015

Storage of construction materials at near the trees should be avoid (P100).

Rectification/improvement was observed during the follow-up audit session on 10 March 2015.

10/03/2015

Clear the construction wastes / materials at near the trees at P99 – P102.

Rectification/improvement was not observed during the follow-up audit session on 17 March 2015. Further follow-up on this item is required.

17/03/2015

Clear the construction materials at near the trees at P113, P102 and P100.

Rectification/improvement was not observed during the follow-up audit session on 23 March 2015. Further follow-up on this item is required.

31/03/2015

Clear the construction wastes / materials at near the trees at P87, between P88 & P89, between P94 & P95, P102 and P113.

Rectification/improvement was not observed during the follow-up audit session on 9 April 2015. Further follow-up on this item is required.

Air Quality

10/03/2015

The unpaved area at near P113 should be watered regularly to avoid dust generation.

Rectification/improvement was observed during the follow-up audit session on 17 March 2015.

23/03/2015

The unpaved site area at near P113 should be watered regularly to avoid dust generation.

Rectification/improvement was observed during the follow-up audit session on 31 March 2015.

Noise

23/03/2015

To repair the noise enclosure at P70.

Rectification/improvement was not observed during the follow-up audit session on 31 March 2015. Further follow-up on this item is required.

31/03/2015

To repair the noise enclosure at P70.

Rectification/improvement was not observed during the follow-up audit session on 9 April 2015. Further follow-up on this item is required.

Waste / Chemical Management

03/03/2015

Clear the accumulated construction wastes at near P107.

Rectification/improvement was observed during the follow-up audit session on 10 March 2015.

03/03/2015

Clear the mixture of water and oil at the drip tray at P87.

Rectification/improvement was observed during the follow-up audit session on 17 March 2015.

17/03/2015

Clear the construction wastes at the side of pile cap of P27.

Rectification/improvement was observed during the follow-up audit session on 23 March 2015.

23/03/2015

Clear the concrete debris and used cement bags at P50.

Rectification/improvement was observed during the follow-up audit session on 31 March 2015.

31/03/2015

Clear the accumulated general refuse at platform at P70.

Rectification/improvement was observed during the follow-up audit session on 9 April 2015.

31/03/2015

To clear the oil spillage at near P109.

Rectification/improvement was not observed during the follow-up audit session on 9 April 2015. Further follow-up on this item is required.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

N/A(1)

N/A(1)

N/A(1)

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

17/03/2015

N/A(1)

N/A(1)

Remark:       N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.