Table 7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
05/05/2015 |
Provide mitigation measures to avoid leakage of
wastewater to the sea at P18. |
Rectification/improvement
was observed during the follow-up audit session on 12 May 2015. |
05/05/2015 |
Properly deploy the silt curtain at P106 and
P107. |
Rectification/improvement
was observed during the follow-up audit session on 18 May 2015. |
|
12/05/2015 |
Properly deploy the silt curtain at P106 and
P107. |
Rectification/improvement
was observed during the follow-up audit session on 18 May 2015. |
|
18/05/2015 |
Muddy water was pumped to the sea directly at
between P81 and P82. The Contractor has turned off the pump immediately
during the site inspection. Anyway, the Contractor was reminded to pump the
muddy water from site for treatment before discharging out. |
Rectification/improvement
was observed during the follow-up audit session on 26 May 2015. |
|
26/05/2015 |
Clear the sedimentation tank to ensure it can
function properly at Portion C. |
Rectification/improvement
was observed during the follow-up audit session on 2 June 2015. |
|
Ecology |
05/05/2015 |
Clear the construction wastes / materials at near
the trees at P113, P102, between P96 & P97, between P94&P95, between
P88&P89 and P87. |
Rectification/improvement
was observed during the follow-up audit session on 18 May 2015. |
12/05/2015 |
Clear the construction wastes / materials at near
the trees at P113. |
Rectification/improvement
was not observed during the follow-up audit session
on 18 May 2015. Further follow-up on this item is required. |
|
26/05/2015 |
Clear the construction wastes / materials at near
the trees near P113. |
Rectification/improvement
was not observed during the follow-up audit session
on 2 June 2015. Further follow-up on this item is required. |
|
Air Quality |
N/A(1) |
N/A(1) |
N/A(1) |
Noise |
N/A(1) |
N/A(1) |
N/A(1) |
Waste / Chemical Management |
05/05/2015 |
Clear the general refuse which was not disposed
properly at P18. |
Rectification/improvement
was observed during the follow-up audit session on 12 May 2015. |
05/05/2015 |
Clear the oil spillage at the area near P108. |
Rectification/improvement
was observed during the follow-up audit session on 12 May 2015. |
|
12/05/2015 |
Clear the accumulated construction wastes at the
area near P106. |
Rectification/improvement
was observed during the follow-up audit session on 2 June 2015. |
|
12/05/2015 |
Clear the waste oil and stagnant water at the
drip tray near P105 and P87. |
Rectification/improvement
was observed during the follow-up audit session on 18 May 2015. |
|
18/05/2015 |
Clear the general refuse / construction wastes
accumulated at the area near P83. |
Rectification/improvement
was observed during the follow-up audit session on 26 May 2015. |
|
18/05/2015 |
Provide sand bag bund to surround the gully at
near P83. |
Rectification/improvement
was observed during the follow-up audit session on 26 May 2015. |
|
18/05/2015 |
Clear the mixture of chemical oil and stagnant
water which is nearly overflow at the drip tray at P18. |
Rectification/improvement
was observed during the follow-up audit session on 26 May 2015. |
|
Landscape & Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
N/A(1) |
N/A(1) |
N/A(1) |
Other |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural Heritage (Sha Lo Wan
(West) Archaeological Site) |
N/A(2) |
N/A(2) |
N/A(2) |
Remark: N/A(1)
- No major environmental deficiency was identified during the site
inspection in the reporting month.
N/A(2) No archaeological site inspection
was conducted in the reporting month.