Table 7.1       Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

04/06/2015

To repair / replace the damage silt curtain for excavation works at P75.

Rectification/improvement was observed during the follow-up audit session on 30 June 2015.

09/06/2015

Provide mitigation measures to avoid the cement materials falling into the sea through the gap of the platform at P53.

Rectification/improvement was observed during the follow-up audit session on 16 June 2015.

09/06/2015

Properly deploy the silt curtain to avoid the gap at between P102 and P101.

Rectification/improvement was observed during the follow-up audit session on 16 June 2015.

23/06/2015

Properly deploy the silt curtain at P68.

Rectification/improvement was observed during the follow-up audit session on 30 June 2015.

30/06/2015

To repair the damage silt curtain at P69.

Rectification/improvement was observed during the follow-up audit session on 7 July 2015.

Ecology

04/06/2015

Clear the construction wastes / materials at near the trees near P113.

Rectification/improvement was observed during the follow-up audit session on 23 June 2015.

09/06/2015

Clear the construction wastes / materials at near the trees at P113.

Rectification/improvement was observed during the follow-up audit session on 23 June 2015.

16/06/2015

Clear the construction wastes / materials at near the trees at P113.

Rectification/improvement was observed during the follow-up audit session on 23 June 2015.

Air Quality

16/06/2015

To repair the damage hoarding at near between P110 and P111.

Rectification/improvement was observed during the follow-up audit session on 23 June 2015.

30/06/2015

To carry out maintenance of excavator which emitted heavy smoke at between P81 and P82

Rectification/improvement was observed during the follow-up audit session on 7 July 2015.

Noise

N/A(1)

N/A(1)

N/A(1)

Waste / Chemical Management

04/06/2015

Clear the mixture of chemical oil and stagnant water which is nearly overflow at the drip tray for generator at near P108.

Rectification/improvement was observed during the follow-up audit session on 23 June 2015.

09/06/2015

Provide drip tray for the generator and oil containers at P53.

Rectification/improvement was observed during the follow-up audit session on 16 June 2015.

09/06/2015

Clear the oil spillage around the generator at P108.

Rectification/improvement was observed during the follow-up audit session on 23 June 2015.

09/06/2015

Clear the construction wastes at the seawall area at between P100 and P99.

Rectification/improvement was observed during the follow-up audit session on 16 June 2015.

09/06/2015

Remove the oil container at the seawall area at between P96 and P97.

Rectification/improvement was observed during the follow-up audit session on 16 June 2015.

16/06/2015

Clear the chemical oil which is nearly overflow at the drip tray for generator at near P108.

Rectification/improvement was observed during the follow-up audit session on 23 June 2015.

23/06/2015

Provide drip tray for the oil containers at the barge at P63.

Rectification/improvement was observed during the follow-up audit session on 30 June 2015.

23/06/2015

Clear the construction wastes at the seawall area at P81.

Rectification/improvement was observed during the follow-up audit session on 30 June 2015.

30/06/2015

Clear the waste materials at the seawall area at between P81 and P82.

Rectification/improvement was observed during the follow-up audit session on 7 July 2015.

30/06/2015

Clear the oil stains at the platform at P69-P70.

Rectification/improvement was observed during the follow-up audit session on 7 July 2015.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

16/06/2015

To remove the invalid construction noise permits at the entrance of Portion C (near P112).

Rectification/improvement was observed during the follow-up audit session on 23 June 2015.

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

23/06/2015

N/A(1)

N/A(1)

Remark: N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.