Table 7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
04/06/2015 |
To repair / replace the damage silt curtain for
excavation works at P75. |
Rectification/improvement
was observed during the follow-up audit session on 30 June 2015. |
09/06/2015 |
Provide mitigation measures to avoid the cement
materials falling into the sea through the gap of the platform at P53. |
Rectification/improvement
was observed during the follow-up audit session on 16 June 2015. |
|
09/06/2015 |
Properly deploy the silt curtain to avoid the gap
at between P102 and P101. |
Rectification/improvement
was observed during the follow-up audit session on 16 June 2015. |
|
23/06/2015 |
Properly deploy the silt curtain at P68. |
Rectification/improvement
was observed during the follow-up audit session on 30 June 2015. |
|
30/06/2015 |
To repair the damage silt curtain at P69. |
Rectification/improvement
was observed during the follow-up audit session on 7 July 2015. |
|
Ecology |
04/06/2015 |
Clear the construction wastes / materials at near
the trees near P113. |
Rectification/improvement
was observed during the follow-up audit session on 23 June 2015. |
09/06/2015 |
Clear the construction wastes / materials at near
the trees at P113. |
Rectification/improvement
was observed during the follow-up audit session on 23 June 2015. |
|
16/06/2015 |
Clear the construction wastes / materials at near
the trees at P113. |
Rectification/improvement
was observed during the follow-up audit session on 23 June 2015. |
|
Air Quality |
16/06/2015 |
To
repair the damage hoarding at near between P110 and P111. |
Rectification/improvement
was observed during the follow-up audit session on 23 June 2015. |
30/06/2015 |
To
carry out maintenance of excavator which emitted heavy smoke at between P81
and P82 |
Rectification/improvement
was observed during the follow-up audit session on 7 July 2015. |
|
Noise |
N/A(1) |
N/A(1) |
N/A(1) |
Waste / Chemical Management |
04/06/2015 |
Clear the mixture of chemical oil and stagnant
water which is nearly overflow at the drip tray for generator at near P108. |
Rectification/improvement
was observed during the follow-up audit session on 23 June 2015. |
09/06/2015 |
Provide drip tray for the generator and oil
containers at P53. |
Rectification/improvement
was observed during the follow-up audit session on 16 June 2015. |
|
09/06/2015 |
Clear the oil spillage around the generator at
P108. |
Rectification/improvement
was observed during the follow-up audit session on 23 June 2015. |
|
09/06/2015 |
Clear the construction wastes at the seawall area
at between P100 and P99. |
Rectification/improvement
was observed during the follow-up audit session on 16 June 2015. |
|
09/06/2015 |
Remove the oil container at the seawall area at
between P96 and P97. |
Rectification/improvement
was observed during the follow-up audit session on 16 June 2015. |
|
16/06/2015 |
Clear the chemical oil
which is nearly overflow at the drip tray for generator at near P108. |
Rectification/improvement
was observed during the follow-up audit session on 23 June 2015. |
|
23/06/2015 |
Provide drip tray for
the oil containers at the barge at P63. |
Rectification/improvement
was observed during the follow-up audit session on 30 June 2015. |
|
23/06/2015 |
Clear the construction
wastes at the seawall area at P81. |
Rectification/improvement
was observed during the follow-up audit session on 30 June 2015. |
|
30/06/2015 |
Clear the waste
materials at the seawall area at between P81 and P82. |
Rectification/improvement
was observed during the follow-up audit session on 7 July 2015. |
|
30/06/2015 |
Clear the oil stains
at the platform at P69-P70. |
Rectification/improvement
was observed during the follow-up audit session on 7 July 2015. |
|
Landscape & Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
16/06/2015 |
To
remove the invalid construction noise permits at the entrance of Portion C
(near P112). |
Rectification/improvement
was observed during the follow-up audit session on 23 June 2015. |
Other |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural Heritage (Sha Lo Wan
(West) Archaeological Site) |
23/06/2015 |
N/A(1) |
N/A(1) |
Remark: N/A(1)
- No major environmental deficiency was identified during the site
inspection in the reporting month.