Table 7.1 Observations and Recommendations of
Site Audit
|
Parameters |
Date |
Observations and Recommendations |
Follow-up |
|
Water Quality |
07/07/2015 |
To repair the damaged silt curtain at P74. |
Rectification/improvement
was observed during the follow-up audit session on 14 July 2015. |
|
07/07/2015 |
Muddy sediment was observed discharged into the
sea at P75. The Contractor was reminded to dispose it properly. |
Rectification/improvement
was observed during the follow-up audit session on 14 July 2015. |
|
|
14/07/2015 |
Clear the waste materials at the platform at P20
to avoid falling into the sea. |
Rectification/improvement
was observed during the follow-up audit session on 21 July 2015. |
|
|
14/07/2015 |
Provide mitigation measures to avoid the leakage
of water from site to the public road (near P111). |
Rectification/improvement
was observed during the follow-up audit session on 21 July 2015. |
|
|
21/07/2015 |
Provision of sedimentation facilities according
to effluent discharge license at P81 and P82. |
Rectification/improvement
was not observed during the follow-up audit session on 28 July 2015. |
|
|
21/07/2015 |
Provide mitigation measures to avoid muddy water
directly discharge to the gullies at between P82 and P83. |
Rectification/improvement
was observed during the follow-up audit session on 28 July 2015. |
|
|
28/07/2015 |
Provide mitigation measures to avoid the fine
materials falling into the sea through the gap at the platform at P7. |
Rectification/improvement
was observed during the follow-up audit session on 4 August 2015. |
|
|
28/07/2015 |
Clear the loose material at the platform at P78. |
Rectification/improvement
was observed during the follow-up audit session on 4 August 2015. |
|
|
28/07/2015 |
Properly repair the damaged part of silt curtain
at P78. |
Rectification/improvement
was observed during the follow-up audit session on 4 August 2015. |
|
|
Ecology |
21/07/2015 |
To remove the
construction wastes at near the trees at P90. |
Rectification/improvement
was observed during the follow-up audit session on 28 July 2015. |
|
Air Quality |
07/07/2015 |
To provide proper shelter (3 sides and on top)
for dusty materials at P74. |
Rectification/improvement
was observed during the follow-up audit session on 14 July 2015. |
|
Noise |
28/07/2015 |
Provide noise emission label for the air
compressor at P7. |
Rectification/improvement
was observed during the follow-up audit session on 4 August 2015. |
|
28/07/2015 |
Provide acoustic decoupling measures for the
generator on barge at P7. |
Rectification/improvement
was observed during the follow-up audit session on 4 August 2015. |
|
|
28/07/2015 |
Ensure the noise enclosure is fully enclosed the
equipment at P78. |
Rectification/improvement
was observed during the follow-up audit session on 4 August 2015. |
|
|
Waste / Chemical Management |
07/07/2015 |
Clear the oil stains
at P74. |
Rectification/improvement
was observed during the follow-up audit session on 14 July 2015. |
|
14/07/2015 |
Provide tarpaulin
sheet at underneath of pressure relief joint to avoid oil spillage at P20. |
Rectification/improvement
was observed during the follow-up audit session on 21 July 2015. |
|
|
14/07/2015 |
Provide drip tray for
the generator at P20. |
Rectification/improvement
was observed during the follow-up audit session on 21 July 2015. |
|
|
14/07/2015 |
Clear the rubbish at
near container office (P113). |
Rectification/improvement
was observed during the follow-up audit session on 21 July 2015. |
|
|
21/07/2015 |
Clear the accumulated construction wastes at P84
and P85. |
Rectification/improvement
was observed during the follow-up audit session on 28 July 2015. |
|
|
Landscape & Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
|
Permits/Licences |
N/A(1) |
N/A(1) |
N/A(1) |
|
Other |
N/A(1) |
N/A(1) |
N/A(1) |
|
Cultural Heritage (Sha Lo Wan
(West) Archaeological Site) |
N/A(2) |
N/A(2) |
N/A(2) |
Remark: N/A(1) - No major environmental
deficiency was identified during the site inspection in the reporting month.
N/A(2) No archaeological site inspection
was conducted in the reporting month.