Table 7.1   Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

07/07/2015

To repair the damaged silt curtain at P74.

Rectification/improvement was observed during the follow-up audit session on 14 July 2015.

07/07/2015

Muddy sediment was observed discharged into the sea at P75. The Contractor was reminded to dispose it properly.

Rectification/improvement was observed during the follow-up audit session on 14 July 2015.

14/07/2015

Clear the waste materials at the platform at P20 to avoid falling into the sea.

Rectification/improvement was observed during the follow-up audit session on 21 July 2015.

14/07/2015

Provide mitigation measures to avoid the leakage of water from site to the public road (near P111).

Rectification/improvement was observed during the follow-up audit session on 21 July 2015.

21/07/2015

Provision of sedimentation facilities according to effluent discharge license at P81 and P82.

Rectification/improvement was not observed during the follow-up audit session on 28 July 2015.

21/07/2015

Provide mitigation measures to avoid muddy water directly discharge to the gullies at between P82 and P83.

Rectification/improvement was observed during the follow-up audit session on 28 July 2015.

28/07/2015

Provide mitigation measures to avoid the fine materials falling into the sea through the gap at the platform at P7.

Rectification/improvement was observed during the follow-up audit session on 4 August 2015.

28/07/2015

Clear the loose material at the platform at P78.

Rectification/improvement was observed during the follow-up audit session on 4 August 2015.

28/07/2015

Properly repair the damaged part of silt curtain at P78.

Rectification/improvement was observed during the follow-up audit session on 4 August 2015.

Ecology

21/07/2015

To remove the construction wastes at near the trees at P90.

Rectification/improvement was observed during the follow-up audit session on 28 July 2015.

Air Quality

07/07/2015

To provide proper shelter (3 sides and on top) for dusty materials at P74.

Rectification/improvement was observed during the follow-up audit session on 14 July 2015.

Noise

28/07/2015

Provide noise emission label for the air compressor at P7.

Rectification/improvement was observed during the follow-up audit session on 4 August 2015.

28/07/2015

Provide acoustic decoupling measures for the generator on barge at P7.

Rectification/improvement was observed during the follow-up audit session on 4 August 2015.

28/07/2015

Ensure the noise enclosure is fully enclosed the equipment at P78.

Rectification/improvement was observed during the follow-up audit session on 4 August 2015.

Waste / Chemical Management

07/07/2015

Clear the oil stains at P74.

Rectification/improvement was observed during the follow-up audit session on 14 July 2015.

14/07/2015

Provide tarpaulin sheet at underneath of pressure relief joint to avoid oil spillage at P20.

Rectification/improvement was observed during the follow-up audit session on 21 July 2015.

14/07/2015

Provide drip tray for the generator at P20.

Rectification/improvement was observed during the follow-up audit session on 21 July 2015.

14/07/2015

Clear the rubbish at near container office (P113).

Rectification/improvement was observed during the follow-up audit session on 21 July 2015.

21/07/2015

Clear the accumulated construction wastes at P84 and P85.

Rectification/improvement was observed during the follow-up audit session on 28 July 2015.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

N/A(1)

N/A(1)

N/A(1)

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

N/A(2)

N/A(2)

N/A(2)

Remark:       N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.

N/A(2) No archaeological site inspection was conducted in the reporting month.