2.1
The proposed Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
(HKLR) is 12km long connecting the Hong Kong-Zhuhai-Macao Bridge (HZMB) at the
HKSAR Boundary with the Hong Kong Boundary Crossing Facilities (HKBCF) situated
at the north eastern waters of the Hong Kong International Airport, opening a
new and direct connection route between Hong Kong, Macao and the Western Pearl
River Delta.
2.2
The HKLR comprises a 9.4km long viaduct section from the HKSAR boundary
to Scenic Hill on the Airport Island; a 1km tunnel section to the reclamation
formed along the east coast of the Airport Island and a 1.6km long at-grade
road section on the reclamation connecting to the HKBCF. The tunnel section of
HKLR will pass under Scenic Hill, Airport Road and Airport Railway to minimize
the environmental and visual impacts to Tung Chung residents.
2.3
An application (No ESB-110/2003) for an Environmental Impact Assessment
(EIA) Study Brief under Section 5(1) of the Environmental Impact Assessment
Ordinance (EIAO) was submitted by Highways Department (the Project Proponent)
on 8 October 2003 with a Project Profile (No. No. PP-201/2003) for the Hong
Kong - Zhuhai - Macao Bridge Hong Kong Section and North Lantau Highway
Connection. The Hong Kong - Zhuhai - Macao Bridge Hong Kong Section and North
Lantau Highway Connection has subsequently been renamed as HKLR. EPD issued an EIA Study Brief (No:
ESB-110/2003) in November 2003 to the Project Proponent to carry out an EIA
study.
2.4
An EIA Study (Reg. No. AEIAR-144/2009) has been undertaken to provide
information on nature and extent of environmental impacts arising from the
construction and operation of HKLR. The Environmental Permit was issued on 4
November 2009 (Permit No. EP-352/2009). Pursuant to Section 13 of the EIAO, the
Director of Environmental Protection amends the Environmental Permit (No.
EP-352/2009) based on the Application No. VEP-339/2011 and the environmental
Permit (Permit No. EP-352/2009/A) was issued on 9 November 2011 for HKLR to the
Highways Department as the Permit Holder. Subsequently, the Director of
Environmental Protection amends the Environmental Permits (No. EP-352/2009/A, EP-352/2009/B,
EP-352/2009/C) based on the Application No. VEP-409/2013, VEP-411/2013 and VEP-459/2014
respectively. The environmental Permit (Permit No. EP-352/2009/D) was then issued
on 22 December 2014.
2.5
Figure 1a-d shows the layout of the Contract
and the scope of the Contract works comprises the following major items:
¡P
a dual 3-lane carriageway in the form of
viaduct from the HKSAR boundary (connecting with the HZMB Main Bridge) to the
Scenic Hill (connecting with the tunnel under separate Contract No.
HY/2011/03), of approximately 9.4km in length with a hard shoulder for each
bound of carriageway and a utilities trough on the outer edge of each bound of
viaducts;
¡P
a grade-separated turnaround facility located near San Shek Wan, composed of sliproads
in the form of viaduct with single-lane carriageway bifurcated from the HKLR
mainline with an elevated junction above the mainline;
¡P
provision of ancillary facilities including, but not limited to,
meteorological enhancement measures including the provisioning of anemometers
and modification of the wind profiler station at hillside of Sha Lo Wan, provisioning of a compensatory marine radar,
and provisioning of security systems; and
¡P
associated civil, structural, geotechnical, marine, environmental
protection, landscaping, drainage and highways electrical and mechanical
(E&M) works, street lightings, traffic aids and sign gantries, marine
navigational aids, ship impact protection system, water mains and fire
hydrants, lightning protection system, structural health monitoring and
maintenance management system (SHM&MMS), supervisory control and data
acquisition (SCADA) system, as well as operation and maintenance provisions of
viaducts, provisioning of facilities for installation of traffic control and
surveillance system (TCSS), provisioning of facilities for installation of
telecommunication cables/equipments and reprovisioning works of affected existing
facilities/utilities.
2.6
Different parties with different levels of involvement in the Contract
organization include:
Supervising Officer¡¦s Representative (SOR) ¡V
Ove Arup & Partners Hong Kong Limited (ARUP)
Contractor ¡VDragages
-China Harbour-VSL JV (DCVJV)
Environmental Team (ET) ¡V Cinotech
Consultants Ltd. (Cinotech)
2.7
The proposed project organization and lines of communication with
respect to the on-site environmental management structure are shown in Figure 2. The key personnel contact
names and numbers are summarized in Table
2.1.
Table 2.1 Key
Contacts of the Contract
|
Party |
Position |
Position |
Phone
No. |
Fax
No. |
|
SOR (ARUP) |
CRE |
Mr. Michael Chan |
3767 5803 |
3767 5922 |
|
Mr. Colin Meadows |
3767 5801 |
|||
|
ENPO/IEC (Ramboll Environ) |
Environmental Project Office Leader |
Mr. Y. H Hui |
3465 2888 |
3465 2899 |
|
Independent Environmental Checker |
Mr. Antony Wong |
3465 2888 |
3465 2899 |
|
|
Contractor
(DCVJV) |
Deputy Project Director |
Mr. W.K Poon |
3121 6638 |
3121 6688 |
|
Environmental Officer |
Mr. CHU Chung Sing |
3121 6672 |
||
|
24-hour Hotline |
-- |
6898 6161 |
-- |
|
|
ET (Cinotech) |
Environmental Team Leader |
Dr. Priscilla Choy |
2151 2089 |
3107 1388 |
2.8
Ramboll Environ Hong Kong Limited (Ramboll
Environ) is employed
by the Highways Department as the Independent Environmental Checker (IEC) and
Environmental Project Office (ENPO) for the Project.
2.9
A copy of Contractor¡¦s
construction programme is provided in Appendix A.
Summary of Construction Works Undertaken During Reporting Month
2.10
The major site
activities undertaken in the reporting month included:
Land Viaduct (P85 to Abutment at SHT) & Marine Viaduct (P81 - P84)
(a) P81L&R - 3 pours of column
were completed in this reporting period.
(b) P82L - ELS excavation works are
in progress.
(c) P82R - excavation works and
waling installation completed, pile cap work is in progress.
(d) P83L - ELS excavation is in
progress.
(e) P83R - 4 pours of column were
completed in this reporting period.
(f) Portal Works:
|
Pier
Location |
Progress |
|
P84 |
Falsework
erection is in progress |
|
P86 |
Erection
of falsework and soffit formwork is in progress |
|
P87 |
Removal
of steel bracket system was completed |
|
P89 |
Steel
fixing is in progress |
|
P90 |
Removal
of formwork is in progress |
|
P91 |
Removal
of falsework is in progress |
|
P92 |
Portal
was concreted on 17 July 2015 |
|
P93 |
Erection
of steel bracket system is in progress |
Marine Viaduct (P0 to P80)
Piling Testing, Coring and Grouting (locations other than P68 & P75):
(a) Grouting
work was carried out at P18 and P20.
Progress at P68
(a) P68 - L1, L2, L4, R4 and R5 were cast, total 8 nos. complete.
(b) One
RCD was set up on R6 casing at end of July 2015 for socket drilling.
Progress at P69
(a) Sheetpiling work at ¡§R¡¨ and ¡§L¡¨ side are in progress.
Progress at P75
(a) P75 R- side - 4 piles were cast.
(b) Excavation to formation at the
L-side continues.
Pile Cap Construction
(a) Precast shells installation - two
CP3 at P57.
(b) Stage 1 concreting was completed
at P2R, P57, P79 & P80.
(c) Stage 1 works is in progress at
P26L.
(d) Stage 2 concreting was completed
at P55.
(e) Stage 2 works is in progress at
P57 & P79.
(f) Kingpost installation and
associated steel welding works for precast shell installation are in progress
at P5R.
(g) Advanced concrete trimming
(inside casing) works were carried out at P5R, P9, D18-L, D18-R & P56 and
concrete trimming (inside cap shell) at P2R, P6, P26L & P57.
(h) Submerged pile cap works with cofferdam:
|
Pier Location |
Side |
Progress |
|
P72 |
L |
Backfilling
and removal of cofferdam start on 21-Jul-15 |
|
R |
Backfilling
and removal of cofferdam start on 21-Jul-15 |
|
|
P74 |
L |
Grouting
works around bored pile is in progress Trimming
of concrete for extension of pile head is in progress |
|
R |
Drilling
of grouting holes is in progress Excavation
around the footprint of pile cap is in progress |
|
|
P75 |
L |
Rock
excavation is in progress |
|
R |
Rock
excavation is in progress |
In-situ Column (Single)
Construction
(a) 1st lift works is in progress at P1, P7, P11
& P13.
(b) 1st lift concrete was poured at P7, P15 & P58.
(c) 2nd lift works is in progress at P58, P53-Ramp, P59-Ramp & P78.
(d) 2nd lift concrete was poured at P53-Ramp, P54 & P59-Ramp.
(e) Pier head works is in progress at P54 & P70.
(f) Pier head concreting: NIL
Precast Column
Erection
|
Description |
Location completed in this reporting period |
Number of Units erected/ Number of Columns
completed in this reporting period |
Cumulative No. of Piers completed (up to 28th of each month) |
|
Commencement (ie.
starting from 1st precast unit) |
P16, P24 |
22 (P16, P21, P24, P25,
P27-P44) |
Commencement (i.e. starting from 1st
precast unit) |
|
Completion (i.e. completed installation of pier head unit) |
Nil |
17 (P28-P44) |
Completion (i.e. completed installation
of pier head unit) |
|
Vertical Tendons Stressed |
P30(50%), P32(50%), P33, P35 (50%) |
15 (P28, P29, P30(1/2),
P32(1/2), P33-P44) |
Vertical Tendons Stressed |
|
Grouting Vertical Tendons |
P28, P34 |
11 (P28, P34, P36-P44) |
Grouting Vertical Tendons |
|
Pier Head Concrete |
P39 |
6 (P39-P44) |
Pier Head Concrete |
In-situ Double Blade
Column Construction
|
Pier Location |
Side |
Progress |
|
P17 |
L |
Poured
concrete up to 2nd lift and started to construct 3rd lift |
|
R |
Poured
concrete up to 1st lift and 2nd lift in progress |
|
|
P18 |
L |
All
cast in July 2015 during this reporting period, total 7 lifts |
|
R |
Poured
concrete up to 6th lift and 7th lift in progress |
|
|
P72 |
L |
All
cast in July 2015, total 3 lifts (including pierhead) |
|
P76 |
L |
Poured
concrete up to 1st lift and 2nd lift in progress |
|
R |
Poured
concrete up to 1st lift and 2nd lift in progress |
|
|
P77 |
L |
Poured
concrete up to 1st lift and 2nd lift in progress |
|
R |
Poured
concrete up to 2nd lift and started to construct 3rd lift |
Marine Portal
(a) Removal of temporary supporting platform at Portal P52 & P60 was
completed.
Deck Erection
(a)
Setting up of Equipment:
|
Type of Equipment |
Status |
|
Lifting Frames 1 (LF1) |
Assembly
of first set of LF1 at WA4 almost completed. Assembly
of the second to fourth set of LF1 is on-going at WA4; Steelwork
for the 3rd and 4th set of Lifting Frames is under
fabrication with some deliveries commenced. |
|
Lifting Frames 3 (LF3) |
Fabrication
of LF3 in China is completed for the 8 sets. Most of the major components
have been delivered to site.
Assembly of the first 4 sets of LF3 is completed and they have started
operation at P64. Assembly of the
5th set is completed. The 6th, 7th and 8th sets
have been commenced at WA4 and they are targeted to be completed by
mid-August. |
|
Launching Gantry 1 (LG1) |
Segment
erection from P114 to P107 completed; Erection
of P106 is in progress. |
|
Launching Gantry 2 (LG2) |
Erection
of P45 to P48 completed (160 segments in total). |
(b)
Segment erection:
|
Type |
Location
of Segments erected in this reporting period |
Number
of Segments erected in this reporting period |
Cumulative
No. of Segments erected (up to
28th of each month) |
|
LG1* |
P108, P107 & P106 |
60 |
302 |
|
LG2 |
P45 |
40 |
160 |
|
LF3 |
P64 |
6 |
6 |
|
SOP |
P42, P43 & P62 |
12 |
54 |
|
Long Span SOP |
P20 |
6 |
6 |
* includes crane erection for P109
Precast Segment
(a)
Segment Casting:
-
Storage for all types of segments is still a key
concern.
-
Production affected by inclement weather (8 days).
-
2 nos. of type D & 4 nos. of type CH mould were
suspended due to storage issue.
-
4 nos. type E, 10 nos. type A,
6 nos. type CH and 1 no. type B were suspended in Mid-July due to storage issue.
-
6 nos. of segments at storage line 3 were toppled
on 13 July 2015. The incident is under investigation.
|
Item |
Number
in this reporting period |
Cumulative
No. of Precast Segment Completed (up to
28th of each month) |
|
Segment Cast |
101 |
2362 |
(b)
Off-site Storage:
|
Area |
No. in
Off-site Storage |
|
A1 |
134 |
|
A2 |
224 |
|
A3 |
174 |
|
A4 |
34 (l/S segment only) |
Precast Concrete
Shell Casting
(a) Summary
of precast shell cast in the precast yard:
|
Type of
Shell |
Number of
Precast Shell Cast in this reporting period |
Cumulative
No. of Precast Shell Completed (up to
28th of each month) |
|
CP1 |
Completed |
94 |
|
CP2 |
Completed |
12 |
|
CP3 |
2 |
14 |
|
CP4 |
Completed |
8 |
|
CP5 |
Completed |
6 |
|
CP6 |
Completed |
4 |
|
CP11 |
Completed |
1 |
|
CP12 |
Completed |
1 |
|
F1 & F1A |
1 |
2 |
|
F2 & F2A |
0 |
0 |
Precast Column &
Precast Pier Head Casting
(a)
Progress of the precast column & precast pier
head casting:
- All casting
works for the pier heads with bearing support were completed (total 30 units)
and the mould was dismantled in this report period.
- 3
moulds (2 piers and 1 pier head) are now in service for precasting
works.
- Totally
23 precast units (16 piers with 6m high, 4 monolithic pier heads and 3 pier
heads with bearing support) were cast in this reporting period.
- Cumulatively
277 precast units were cast.
Delivery for Precast Concrete Elements (by barge)
(a)
Precast Deck Segments:
-
Number of additional barges
engaged in this period: 0
-
Cumulative number of barges: 14
(2 barges tied up on L/S storage)
-
Number of deck segment deliveries
in this period: 23 trips
-
Cumulative number of deck
segment deliveries: 116 trips
|
Segment
Types |
Segment
Delivered in this reporting period |
Cumulative
No. of Precast Segment Delivered (up to
28th of each month) |
|
A |
57 |
224 |
|
B |
0 |
0 |
|
C |
2 |
6 |
|
D |
3 |
4 |
|
E |
74 |
342 |
(b)
Precast column units:
-
Number of additional barges engaged in this period:
0
-
Cumulative number of barges: 2
-
Number of column unit deliveries in this period: 3
trips
-
Cumulative number of column unit deliveries: 33
trips
|
Unit
Types |
Number
of units delivered in this reporting period |
Cumulative
No. of Precast Column Delivered (up to
28th of month) |
|
3m |
4 |
23 |
|
6m |
13 |
86 |
|
PH1 |
2 |
22 |
|
PH2 |
0 |
14 |
(c)
Temporary storage of long span segments:
-
3 barges have been unloaded at CCCC4 yard. 2 barges
remain with long span stored with P20 +1, +2. These barges will not unload at
CCCC4 and the segments will remain stored on the barges until required for
delivery to Hong Kong which is estimated to be mid to late September 2015.
(d)
General:
-
Delays in the segment unloading continue to impact
on the delivery cycle to the extent that there are number of barges overstayed
for 14 days in Hong Kong.
-
Loading and unloading was impacted by inclement
weather (typhoon and heavy rain events).
-
It has been necessary to deploy 2 additional barges
to columns delivery in order to overcome storage issues and potential stoppages
at MBEC precast yard.
2.11 A summary
of the relevant permits, licences, and/or notifications on environmental
protection for this Contract is presented in Table 2.2.
Table 2.2 Status
of Environmental Licences, Notification and Permits
|
Permit
/ License No. |
Valid
Period |
Status |
|
|
From |
To |
||
|
Environmental Permit (EP) |
|||
|
EP-352/2009/D |
22/12/2014 |
N/A |
Valid |
|
Consruction Noise Permit
(CNP) |
|||
|
WA7: GW-RW1024-14 |
13/01/2015(19:00) |
12/07/2015(07:00) |
Expired |
|
P76 ¡V P80: GW-RS0094-15 |
03/02/2015(01:30) |
02/08/2015(08:00) |
Valid |
|
P81 ¡V P114: GW-RS0122-15 |
06/02/2015(19:00) |
05/08/2015(23:00) |
Cancelled
on 29 July 2015 |
|
P0 ¡V P68: GW-RS0130-15 |
10/02/2015(19:00) |
08/08/2015(24:00) |
Valid |
|
Waters next to Southeast Quay: GW-RS0181-15 |
23/02/2015(19:00) |
22/08/2015(23:00) |
Valid |
|
P53 ¡V P59: GW-RS0314-15 |
31/03/2015(00:00) |
30/09/2015(07:00) |
Valid |
|
P101 ¡V P114: GW-RS0364-15 |
08/04/2015(19:00) |
07/07/2015(05:30) |
Expired |
|
WA4: GW-RW0207-15 |
29/04/2015(19:00) |
28/10/2015(23:00) |
Valid |
|
P86: GW-RS0460-15 |
04/05/2015(00:00) |
31/08/2015(05:30) |
Valid |
|
P100 ¡V P111: GW-RS0487-15 |
07/05/2015(23:00) |
06/11/2015(07:00) |
Valid |
|
P75 ¡V P80: GW-RS0508-15 |
13/05/2015(19:00) |
12/07/2015(24:00) |
Cancelled
on 6 July 2015 |
|
P69 ¡V P74: GW-RS0584-15 |
01/06/2015(00:00) |
30/11/2015(24:00) |
Valid |
|
P101 ¡V P114: GW-RS0715-15 |
07/07/2015(19:00) |
31/10/2015(05:30) |
Valid |
|
P75 ¡V P80: GW-RS0730-15 |
17/07/2015(19:00) |
05/01/2016(24:00) |
Valid |
|
P0 ¡V P68: GW-RS0783-15 |
17/07/2015(19:00) |
13/01/2016(24:00) |
Valid |
|
P81 ¡V 83: GW-RS0814-15 |
30/07/2015(19:00) |
29/01/2016(24:00) |
Valid |
|
P81 ¡V 115: GW-RS0818-15 |
29 /07/2015(19:00) |
28/01/2016(23:00) |
Valid |
|
P75 ¡V 80: GW-RS0829-15 |
30 /07/2015(19:00) |
31/12/2015(24:00) |
Valid |
|
Notification pursuant to Air Pollution
Control (Construction Dust) Regulation |
|||
|
345773 |
N/A |
Receipt acknowledged by EPD |
|
|
Billing Account for Construction Waste
Disposal |
|||
|
A/C# 7015341 (Construction Site) |
11/06/2012 |
N/A |
Valid |
|
A/C# 7016948 (Vessel Disposal) |
22/05/2015 |
31/08/2015 |
Valid |
|
Registration of Chemical Waste Producer |
|||
|
WPN
5213-951-D2499-01 |
18/07/2012 |
N/A |
Valid |
|
Effluent Discharge License under Water
Pollution Control Ordinance |
|||
|
WA6A(DCVJV
site office): WT00014053-2012 |
12/09/2012 |
30/09/2017 |
Valid |
|
WA6B (SOR site office):
WT00014447-2012 |
30/10/2012 |
31/10/2017 |
Valid |
|
WA3:
WT00015118-2013 |
30/01/2013 |
31/01/2018 |
Valid |
|
Portion C:
WT00015356-2013 |
22/02/2013 |
28/02/2018 |
Valid |
|
Portion A:
WT00016076-2013 |
21/05/2013 |
31/05/2018 |
Valid |
|
WA4B:
WT00014750-2012 |
12/08/2013 |
31/08/2018 |
Valid |
|
WA7:
WT00015722-2013 |
16/01/2013 |
31/01/2019 |
Valid |
|
P0 ¡V P80: WT00018203-2014 |
30/01/2013 |
31/01/2019 |
Valid |
|
P114: WT00018631-2014 |
31/03/2014 |
31/03/2019 |
Valid |
|
P81-P83: WT00021946-2015 |
08/07/2015 |
31/07/2020 |
Valid |
|
Marine Dumping Permit |
|||
|
Dumping of Phase 1, 2a, 2b, 2c and 2d
(Type 1 ¡V Open Sea Disposal) marine sediment EP/MD/15-226 |
11/02/2015 |
09/08/2015 |
Valid |
|
Cross-border dumping of dredged sediment
of Category L and Category Mp at Erzhou Island in China EP/MD/16-045 |
21/07/2015 |
20/08/2015 |
Valid |