7.1
Site audits were carried out by ET on weekly basis to monitor the timely
implementation of proper environmental management practices and mitigation
measures in the Contract site. The
summaries of site audits are attached in Appendix
M.
7.2
Site audits were conducted on 7th, 14th, 21st
and 28th July 2015 by ET after the commencement of construction
works for the Contract. A joint site audit with the representative with IEC, SOR,
the Contractor and the ET was carried out on 28th July 2015. The
details of observations during site audit can refer to Table 7.1.
7.3
According to EP condition 4.7 and EM&A Manual, periodic monitoring
(every three months) of construction works shall be conducted to ensure the avoidance
of any impacts on Sha Lo Wan (West) Archaeological
Site. Access to Sha Lo Wan (West) Archaeological site
for works areas and storage of construction equipment is not allowed. The
10th inspection to the Sha Lo Wan (West) Archaeological Site was conducted
on 23th June 2015 and next inspection will be conducted in September
2015.
7.4
According to the EIA Study Report, Environmental Permit and the EM&A
Manual, the mitigation measures detailed in the documents are recommended to be
implemented during the construction phase.
An updated summary of the EMIS is provided in Appendix N.
7.5
Regular marine travel route for marine vessels were implemented properly
in accordance with the submitted plan and relevant records were kept properly.
7.6
Acoustic decoupling measures for the stationary equipment (generators,
winch generators and air compressors) mounted on boards were adopted according
to EP Condition 3.7 and EM&A Manual, Section 10.2.18.
7.7
Dolphin exclusion zone and dolphin watching plan according to EM&A
Manual, Section 10.2.12 and EP Condition 3.5 was implemented by DCVJV’s trained
dolphin watcher.
7.8
Spill kits and booms are ready on site for the event of accidental
spillage of oil or other hazardous chemicals from construction activities
including vessels operating for the Contract.
7.9
During site inspections in the reporting month, no non-conformance was
identified. The observations and recommendations made during the audit sessions
are summarized in Table 7.1.
Table
7.1 Observations and
Recommendations of Site Audit
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Water Quality |
07/07/2015 |
To
repair the damaged silt curtain at P74. |
Rectification/improvement was observed during
the follow-up audit session on 14 July 2015. |
07/07/2015 |
Muddy
sediment was observed discharged into the sea at P75. The Contractor was
reminded to dispose it properly. |
Rectification/improvement was observed during
the follow-up audit session on 14 July 2015. |
|
14/07/2015 |
Clear
the waste materials at the platform at P20 to avoid falling into the sea. |
Rectification/improvement was observed during
the follow-up audit session on 21 July 2015. |
|
14/07/2015 |
Provide
mitigation measures to avoid the leakage of water from site to the public
road (near P111). |
Rectification/improvement was observed during
the follow-up audit session on 21 July 2015. |
|
21/07/2015 |
Provision
of sedimentation facilities according to effluent discharge license at P81
and P82. |
Rectification/improvement was not observed
during the follow-up audit session on 28 July 2015. |
|
21/07/2015 |
Provide
mitigation measures to avoid muddy water directly discharge to the gullies at
between P82 and P83. |
Rectification/improvement was observed during
the follow-up audit session on 28 July 2015. |
|
28/07/2015 |
Provide
mitigation measures to avoid the fine materials falling into the sea through
the gap at the platform at P7. |
Rectification/improvement was observed during
the follow-up audit session on 4 August 2015. |
|
28/07/2015 |
Clear
the loose material at the platform at P78. |
Rectification/improvement was observed during
the follow-up audit session on 4 August 2015. |
|
28/07/2015 |
Properly
repair the damaged part of silt curtain at P78. |
Rectification/improvement was observed during
the follow-up audit session on 4 August 2015. |
|
Ecology |
21/07/2015 |
To remove the construction wastes at near the
trees at P90. |
Rectification/improvement was observed during
the follow-up audit session on 28 July 2015. |
Air Quality |
07/07/2015 |
To
provide proper shelter (3 sides and on top) for dusty materials at P74. |
Rectification/improvement was observed during
the follow-up audit session on 14 July 2015. |
Noise |
28/07/2015 |
Provide
noise emission label for the air compressor at P7. |
Rectification/improvement was observed during
the follow-up audit session on 4 August 2015. |
28/07/2015 |
Provide
acoustic decoupling measures for the generator on barge at P7. |
Rectification/improvement was observed during
the follow-up audit session on 4 August 2015. |
|
28/07/2015 |
Ensure
the noise enclosure is fully enclosed the equipment at P78. |
Rectification/improvement was observed during
the follow-up audit session on 4 August 2015. |
|
Waste / Chemical Management |
07/07/2015 |
Clear the oil stains at P74. |
Rectification/improvement was observed during
the follow-up audit session on 14 July 2015. |
14/07/2015 |
Provide tarpaulin sheet at underneath of pressure
relief joint to avoid oil spillage at P20. |
Rectification/improvement was observed during
the follow-up audit session on 21 July 2015. |
|
14/07/2015 |
Provide drip tray for the generator at P20. |
Rectification/improvement was observed during
the follow-up audit session on 21 July 2015. |
|
14/07/2015 |
Clear the rubbish at near container office
(P113). |
Rectification/improvement was observed during
the follow-up audit session on 21 July 2015. |
|
21/07/2015 |
Clear
the accumulated construction wastes at P84 and P85. |
Rectification/improvement was observed during
the follow-up audit session on 28 July 2015. |
|
Landscape & Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
N/A(1) |
N/A(1) |
N/A(1) |
Other |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural
Heritage (Sha Lo Wan (West) Archaeological Site) |
N/A(2) |
N/A(2) |
N/A(2) |
Remark: N/A(1) - No major environmental
deficiency was identified during the site inspection in the reporting month.
N/A(2) No
archaeological site inspection was conducted in the reporting month.
7.10
According to the Contractor, 293m3 inert C&D materials were
generated during the reporting month.
7.11
The Contractor was advised to minimize the wastes generated through the
recycling or reusing. All mitigation measures stipulated in approved waste management
plan shall be fully implemented.
7.12
The amount of wastes generated by the activities of the Contract during
the reporting month is shown in Appendix
O.