8               ENVIRONMENTAL NON-CONFORMANCE (EXCEEDANCES)

Summary of Exceedances

 

8.1         Summary of exceedance is provided in Appendix L.

8.2         There are no Action Level and two Limit Level exceedances for 1-hr TSP were recorded.

8.3         ET’s investigation has been conducted and the investigation report is under review by IEC.

8.4         No Action/Limit Level exceedance was recorded for 24-hr TSP and construction noise.

8.5         There are five Action Level and six Limit Level exceedances for suspended solids were recorded. No Action/Limit Level exceedance for dissolved oxygen and turbidity were recorded.

 

8.6         According to the investigation, no pollution discharge was observed from the site. Adverse water quality outside the site boundary and dispersion of sediment plume to the monitoring stations from the area outside the site boundary (i.e. works area not under and related to HY/2011/09) was observed. In addition, sediment plume due to natural fluctuation of shallow water were also observed. Therefore, the exceedances are considered not due to the Contract.

 

Summary of Environmental Complaint

 

8.7         No environmental related complaint was received in the reporting month. The Complaint Log is attached in Appendix P.

Summary of Notification of Summons and Successful Prosecution

8.8         There was one prosecution or notification of summons received since the Contract commencement. Summary of successful prosecution as attached in Appendix Q.