7.1
Site audits were carried out by ET on weekly basis to monitor the timely
implementation of proper environmental management practices and mitigation
measures in the Contract site. The
summaries of site audits are attached in Appendix
M.
7.2
Site audits were conducted on 1st, 10th, 15th,
23rd and 29th December 2015 by ET after the commencement
of construction works for the Contract. A joint site audit with the
representative with IEC, SOR, the Contractor and the ET was carried out on 29th
December 2015. The details of observations during site audit can refer to Table 7.1.
7.3
According to EP condition 4.7 and EM&A Manual, periodic monitoring
(every three months) of construction works shall be conducted to ensure the
avoidance of any impacts on Sha Lo Wan (West) Archaeological Site. Access to
Sha Lo Wan (West) Archaeological site for works areas and storage of
construction equipment is not allowed. The 12th inspection
to the Sha Lo Wan (West) Archaeological Site was conducted on 29th
December 2015 and next inspection will be conducted in March 2015.
7.4
According to the EIA Study Report, Environmental Permit and the EM&A
Manual, the mitigation measures detailed in the documents are recommended to be
implemented during the construction phase.
An updated summary of the EMIS is provided in Appendix N.
7.5
Regular marine travel route for marine vessels were implemented properly
in accordance with the submitted plan and relevant records were kept properly.
7.6
Acoustic decoupling measures for the stationary equipment (generators,
winch generators and air compressors) mounted on boards were adopted according
to EP Condition 3.7 and EM&A Manual, Section 10.2.18.
7.7
Dolphin exclusion zone and dolphin watching plan according to EM&A
Manual, Section 10.2.12 and EP Condition 3.5 was implemented by DCVJV’s trained
dolphin watcher.
7.8
Spill kits and booms are ready on site for the event of accidental
spillage of oil or other hazardous chemicals from construction activities
including vessels operating for the Contract.
7.9
During site inspections in the reporting month, no non-conformance was
identified. The observations and recommendations made during the audit sessions
are summarized in Table 7.1.
Table
7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Water Quality |
01/12/2015 |
Properly deploy the
silt curtain at P81 and P83. |
Rectification/improvement was observed during
the follow-up audit session on 10 December 2015. |
01/12/2015 |
Clear the floating
rubbish and damaged silt curtain at P91. |
Rectification/improvement was not observed
during the follow-up audit session on 10 December 2015.
Further
follow-up on this item is required. |
|
10/12/2015 |
Properly deploy the
silt curtain at P68. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
10/12/2015 |
Ensure adequate
capacity of sedimentation facilities at Portion C (P110). |
Rectification/improvement was observed during
the follow-up audit session on 15 December 2015. |
|
10/12/2015 |
Clear the floating
rubbish and damaged silt curtain at P91. |
Rectification/improvement was not observed
during the follow-up audit session on 15 December 2015.
Further
follow-up on this item is required. |
|
15/12/2015 |
Minor sediment plume
was observed outside the silt curtain at P69. The Contractor was reminded to
rectify this deficiency accordingly. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
15/12/2015 |
Floating rubbish was
observed within the silt curtain at P69. The Contractor was reminded to clear
it ASAP. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
15/12/2015 |
Properly deploy the
silt curtain at P68. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
15/12/2015 |
Clear the floating
rubbish and damage silt curtain at P91. |
Rectification/improvement was not observed
during the follow-up audit session on 23 December 2015.
Further
follow-up on this item is required. |
|
15/12/2015 |
Provide proper
sedimentation facilities at P68 to ensure the discharge comply with WPCO
license. |
Rectification/improvement was not observed
during the follow-up audit session on 23 December 2015.
Further
follow-up on this item is required. |
|
23/12/2015 |
Properly
deploy the silt curtain at P78. |
Rectification/improvement was observed during
the follow-up audit session on 29 December 2015. |
|
29/12/2015 |
Clear
the sand and debris at the platform at P69. |
Rectification/improvement was observed during
the follow-up audit session on 5 January 2016. |
|
29/12/2015 |
Provide
wastewater treatment facilities at P69, if necessary. |
Rectification/improvement was observed during
the follow-up audit session on 5 January 2016. |
|
Ecology |
01/12/2015 |
Properly erect the
fencing to protect the trees at P98. |
Rectification/improvement was not observed
during the follow-up audit session on 10 December 2015.
Further
follow-up on this item is required. |
10/12/2015 |
Properly erect the
fencing to protect the trees at P98. |
Rectification/improvement was not observed
during the follow-up audit session on 15 December 2015.
Further
follow-up on this item is required. |
|
15/12/2015 |
Properly erect the
fencing to protect the trees at P98. |
Rectification/improvement was not observed
during the follow-up audit session on 23 December 2015.
Further
follow-up on this item is required. |
|
Air Quality |
01/12/2015 |
Properly cover the stockpile of excavated
materials at P88. |
Rectification/improvement was observed during
the follow-up audit session on 10 December 2015. |
10/12/2015 |
Provide NRMM label and noise emission label
for the air compressor and excavator which will be used on site at P68. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
15/12/2015 |
Provide NRMM label for the air compressor
at P68. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
Noise |
10/12/2015 |
Provide NRMM label and noise emission label
for the air compressor and excavator which will be used on site at P68. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
Waste / Chemical Management |
01/12/2015 |
Provide waste sorting for the accumulated
construction waste at P86. |
Rectification/improvement was observed during
the follow-up audit session on 10 December 2015. |
01/12/2015 |
Clear the rubbish at near the wetsep at Portion C (P110). |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
01/12/2015 |
Clear the U-Channel at P102 and Portion C
(P111). |
Rectification/improvement was observed during
the follow-up audit session on 15 December 2015. |
|
10/12/2015 |
Clear the rubbish at near the wetsep at Portion C (P110). |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
10/12/2015 |
Clear the U-Channel at P102 and Portion C
(P111). |
Rectification/improvement was observed during
the follow-up audit session on 15 December 2015. |
|
10/12/2015 |
Clear the oil containers and oil leakage at
near the discharging point at P106 (Portion C). |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
10/12/2015 |
Provide proper area for the equipment
(segment carrier) maintenance works to avoid soil contamination at P102. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
15/12/2015 |
Clear the rubbish at near the wetsep at Portion C (P110). |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
15/12/2015 |
Clear the oil containers and oil leakage at
near the discharging point at P106 (Portion C). |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
15/12/2015 |
Provide proper area for the equipment (segment
carrier / lift equipment) maintenance works to avoid soil contamination at
P102 and P109. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
15/12/2015 |
Provide drip tray for the oil containers at
P70. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
15/12/2015 |
Clear the oil spillage at near the air
compressor at P68. |
Rectification/improvement was observed during
the follow-up audit session on 23 December 2015. |
|
23/12/2015 |
Provide drip tray for the chemical
containers at P63, P64 and P78. |
Rectification/improvement was observed during
the follow-up audit session on 29 December 2015. |
|
23/12/2015 |
Clear the oily water at the drip tray as
chemical waste at P64. |
Rectification/improvement was observed during
the follow-up audit session on 29 December 2015. |
|
23/12/2015 |
Clear the accumulated rubbish at P64
regularly. |
Rectification/improvement was observed during
the follow-up audit session on 29 December 2015. |
|
29/12/2015 |
Ensure the valves at the drip tray are
closed to avoid the leakage of oily water at P69 & P70. |
Rectification/improvement was observed during
the follow-up audit session on 5 January 2016. |
|
29/12/2015 |
Provide drip tray for the chemical
containers at P80. |
Rectification/improvement was observed during
the follow-up audit session on 5 January 2016. |
|
Landscape & Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
N/A(1) |
N/A(1) |
N/A(1) |
Other |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural
Heritage (Sha Lo Wan
(West) Archaeological Site) |
29/12/2015 |
N/A(1) |
N/A(1) |
Remark: N/A(1)
- No major environmental deficiency was identified during the site
inspection in the reporting month.
7.10
According to the Contractor, 5,619m3 inert C&D materials
were generated during the reporting month.
7.11
The Contractor was advised to minimize the wastes generated through the
recycling or reusing. All mitigation measures stipulated in approved waste management
plan shall be fully implemented.
7.12
The amount of wastes generated by the activities of the Contract during
the reporting month is shown in Appendix
O.