8.1
Summary of exceedance is provided in Appendix L.
8.2
No Action/Limit Level exceedance was recorded for air quality and
construction noise.
8.3
There are fourteen Action Level and no Limit Level exceedances for suspended
solids were recorded. No Action/Limit Level exceedance for dissolved oxygen and
turbidity were recorded.
8.4
According to the investigation, no pollution
discharge was observed from the site. In addition, adverse
water quality outside the site boundary and dispersion
of sediment plume to the monitoring stations from the area outside the site
boundary (i.e. works area not under and related to HY/2011/09) were observed.
Therefore, the exceedances are considered not due to the Contract
Summary of Environmental Complaint
8.5
No environmental related complaint was received in the reporting month. The
Complaint Log is attached in Appendix P.
8.6
There was one prosecution or notification of summons received since the Contract
commencement. Summary of successful prosecution as attached in Appendix Q.