1.
This is the 36th monthly Environmental Monitoring and Audit
(EM&A) Report prepared by Cinotech Consultants
Limited for the project
¡§Contract No. HY/2011/09 ¡V Hong
Kong-Zhuhai-Macao Bridge Hong Kong Link Road ¡V Section between HKSAR Boundary
and Scenic Hill¡¨ (hereinafter called the ¡§Contract¡¨). This report documents the findings of EM&A Works conducted in
January 2016.
Environmental Monitoring and Audit Progress
2.
A summary of the monitoring activities in this reporting month is listed
in Table I below:
Table I Summary
Table for Monitoring Activities in the Reporting Month
Parameter(s) |
Date(s) |
1-hr
TSP Monitoring |
6th, 12th,
18th, 22nd and 28th January 2016 |
24-hr
TSP Monitoring |
6th, 12th,
18th, 22nd and 28th January 2016 |
Noise
Monitoring |
7th, 13th,
19th and 29th January 2016 |
Water
Quality Monitoring |
2nd, 4th,
6th, 8th, 11th, 13th, 15th,
18th, 20th, 22nd, 25th, 27th
and 29th January 2016 |
6th and 21st
January 2016 |
|
Additional
Land-based Dolphin Behaviour and Movement
Monitoring |
7th and 12th January 2016 |
Environmental
Site Inspection |
5th, 12th,
19th and 26th January 2016 |
Archaeological
Site Inspection |
(1) N/A |
Remark:
(1) No archaeological site
inspection was conducted in the reporting month.
Breaches of Action and Limit Levels
3.
Summary of the environmental exceedances of the reporting month is
tabulated in Table II.
Table II Summary
Table for Events Recorded in the Reporting Month
Environmental Monitoring |
Parameter |
No. of Exceedance |
Total
No. of Exceedance |
No. of Exceedance related to the Construction Activities of this Contract |
Total No. of Exceedance related to the Construction Activities of this Contract |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
||||
Air Quality |
1-hr TSP |
0 |
0 |
0 |
0 |
0 |
0 |
24-hr TSP |
1 |
0 |
1 |
0 |
0 |
0 |
|
Noise |
Leq(30min) |
0 |
0 |
0 |
0 |
0 |
0 |
Water Quality |
Dissolved Oxygen (DO)
(Surface & Middle) |
0 |
0 |
0 |
0 |
0 |
0 |
Dissolved Oxygen (DO)
(Bottom) |
0 |
0 |
0 |
0 |
0 |
0 |
|
Turbidity |
0 |
0 |
0 |
0 |
0 |
0 |
|
Suspended Solids (SS) |
0 |
0 |
0 |
0 |
0 |
0 |
1-hour
TSP Monitoring
4.
All 1-hour TSP monitoring was conducted as scheduled in the reporting month. No Action/Limit Level exceedance was
recorded.
24-hour
TSP Monitoring
5.
All 24-hour TSP monitoring was conducted as scheduled in the reporting month. No Limit Level exceedance was recorded.
One Action Level exceedance for 24-hr TSP monitoring at AMS4 was recorded on 22 January
2016.
6.
According to the investigation, no dust generation works was conducted
at near the monitoring station during the monitoring and observable dust source
from construction activity under Contract No. HY/2011/09. In addition, village
lorry which emitted heavy smoke was observed. Therefore, the exceedance is
considered not due to the Contract.
Construction
Noise
7.
All construction noise monitoring was conducted as scheduled in the
reporting month. No Action/Limit Level exceedance was recorded.
Water Quality
8.
All water quality monitoring was conducted as scheduled in the reporting
month. No Action/Limit Level exceedance was recorded.
Complaint Log
9.
No environmental complaint was received in the reporting month.
Notification of
Summons and Successful Prosecutions
10.
No notification of summons and successful prosecution was received in
the reporting month.
11.
This report has been developed in compliance with the reporting
requirements for the subsequent monthly EM&A Report as required by the
EM&A Manual for Hong Kong Link Road (EM&A Manual).
12.
Major site activities for
the coming reporting month will include:
WA4
Fabrication of lifting frames
Deliveries of frame structures
WA7
Storage Area
Marine
Viaduct (P0 to P80)
Pile
Cap Construction:
Emerged and submerged pile cap works
Concreting works
Steel re-bar fixing for pile cap
Removal of rockfill
platform
Column
Construction:
Lifting works
Lift concrete pouring
Pier head works
Pier head concreting
Precast
Column Erection
Installation of base units and precast units
Stressing of vertical nailing tendons
Vertical Tendons Stressed
Grouting Vertical Tendons
Pier Head Concrete
Double
Blade Column
Formwork assembly
Deck
Erection
Setting up of equipment
Segment erection
Precast
Segment
Segment casting
Land
Viaduct (P81 to Abutment at Scenic Hill Tunnel (SHT))
Removal of filled platform
Reinstatement works
Backfilling
Removal of sheet pile cofferdam
Open cut excavation
Removal of steel bracket system
Dismantling of formworks and falsework for
in-situ end segment