Table 7.1       Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

01/03/2016

Properly repair the damage silt curtain or replace with the new silt curtain to surround the works at P68.

Rectification/improvement was observed during the follow-up audit session on 8 March 2016.

08/03/2016

Properly repair the silt curtain to avoid the gap at P83.

Rectification/improvement was observed during the follow-up audit session on 15 March 2016.

08/03/2016

Clear the wooden board at the seawall area at P88.

Rectification/improvement was observed during the follow-up audit session on 15 March 2016.

08/03/2016

To avoid the leakage of wastewater from the bridge surface (P98).

Rectification/improvement was observed during the follow-up audit session on 22 March 2016.

15/03/2016

Clear the expoxy residue on the pier surface and provide mitigation measures to prevent it falling into the sea.

Rectification/improvement was observed during the follow-up audit session on 22 March 2016.

15/03/2016

Clear the handrails at the seawall area at P105.

Rectification/improvement was observed during the follow-up audit session on 22 March 2016.

15/03/2016

To avoid the leakage of wastewater from the bridge surface (P98).

Rectification/improvement was observed during the follow-up audit session on 22 March 2016.

29/03/2016

Clear the water barrier and silt curtain at the intertidal area at near P69.

Rectification/improvement was observed during the follow-up audit session on 5 April 2016.

29/03/2016

Clear the sand and debris at the platform at P70.

Rectification/improvement was observed during the follow-up audit session on 5 April 2016.

29/03/2016

Clear the black foam boar at the marine water at P81.

Rectification/improvement was observed during the follow-up audit session on 5 April 2016.

Ecology

08/03/2016

Clear the construction wastes at near the trees at P88.

Rectification/improvement was observed during the follow-up audit session on 15 March 2016.

15/03/2016

To remove the oil drum at near the trees at Portion C (P111).

Rectification/improvement was observed during the follow-up audit session on 22 March 2016.

Air Quality

08/03/2016

Properly repair the enclosure for the grouting works at bridge surface (P98).

Rectification/improvement was observed during the follow-up audit session on 22 March 2016.

15/03/2016

Properly repair the enclosure for the grouting works and cover the cement bags at the bridge surface at P98.

Rectification/improvement was observed during the follow-up audit session on 22 March 2016.

Noise

N/A(1)

N/A(1)

N/A(1)

Waste / Chemical Management

01/03/2016

Provide tarpaulin sheet at underneath of the parts of breaker and clear the oil leakage at P68.

Rectification/improvement was observed during the follow-up audit session on 8 March 2016.

01/03/2016

Provide drip tray for the oil containers at P76.

Rectification/improvement was observed during the follow-up audit session on 8 March 2016.

08/03/2016

Clear the rubbish at near the waste skip at Portion C (P111).

Rectification/improvement was observed during the follow-up audit session on 15 March 2016.

15/03/2016

Provide spill kit at the bridge surface at P19.

Rectification/improvement was observed during the follow-up audit session on 22 March 2016.

15/03/2016

Provide drip tray for the chemical containers at the bridge surface at P19.

Rectification/improvement was observed during the follow-up audit session on 22 March 2016.

15/03/2016

Provide drip tray for the chemical containers at P91.

Rectification/improvement was observed during the follow-up audit session on 22 March 2016.

22/03/2016

Provide spill kit at P47 to clear the oil leakage and the oil pump should be properly placed inside the drip tray.

Rectification/improvement was observed during the follow-up audit session on 29 March 2016.

22/03/2016

Clear the accumulated rubbish at P46.

Rectification/improvement was observed during the follow-up audit session on 29 March 2016.

29/03/2016

Clear the oily water at the drip tray as chemical wastes at P75.

Rectification/improvement was observed during the follow-up audit session on 5 April 2016.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

N/A(1)

N/A(1)

N/A(1)

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

29/3/2016

N/A(1)

N/A(1)

Remark: N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month