Table 7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
01/03/2016 |
Properly repair the
damage silt curtain or replace with the new silt curtain to surround the
works at P68. |
Rectification/improvement
was observed during the follow-up audit session on 8 March 2016. |
08/03/2016 |
Properly repair the
silt curtain to avoid the gap at P83. |
Rectification/improvement
was observed during the follow-up audit session on 15 March 2016. |
|
08/03/2016 |
Clear the wooden board
at the seawall area at P88. |
Rectification/improvement
was observed during the follow-up audit session on 15 March 2016. |
|
08/03/2016 |
To avoid the leakage
of wastewater from the bridge surface (P98). |
Rectification/improvement
was observed during the follow-up audit session on 22 March 2016. |
|
15/03/2016 |
Clear the expoxy residue on the pier surface and provide mitigation
measures to prevent it falling into the sea. |
Rectification/improvement
was observed during the follow-up audit session on 22 March 2016. |
|
15/03/2016 |
Clear the handrails at
the seawall area at P105. |
Rectification/improvement
was observed during the follow-up audit session on 22 March 2016. |
|
15/03/2016 |
To avoid the leakage
of wastewater from the bridge surface (P98). |
Rectification/improvement
was observed during the follow-up audit session on 22 March 2016. |
|
29/03/2016 |
Clear the water
barrier and silt curtain at the intertidal area at near P69. |
Rectification/improvement
was observed during the follow-up audit session on 5 April 2016. |
|
29/03/2016 |
Clear the sand and
debris at the platform at P70. |
Rectification/improvement
was observed during the follow-up audit session on 5 April 2016. |
|
29/03/2016 |
Clear the black foam
boar at the marine water at P81. |
Rectification/improvement
was observed during the follow-up audit session on 5 April 2016. |
|
Ecology |
08/03/2016 |
Clear
the construction wastes at near the trees at P88. |
Rectification/improvement
was observed during the follow-up audit session on 15 March 2016. |
15/03/2016 |
To
remove the oil drum at near the trees at Portion C (P111). |
Rectification/improvement
was observed during the follow-up audit session on 22 March 2016. |
|
Air Quality |
08/03/2016 |
Properly
repair the enclosure for the grouting works at bridge surface (P98). |
Rectification/improvement
was observed during the follow-up audit session on 22 March 2016. |
15/03/2016 |
Properly
repair the enclosure for the grouting works and cover the cement bags at the
bridge surface at P98. |
Rectification/improvement
was observed during the follow-up audit session on 22 March 2016. |
|
Noise |
N/A(1) |
N/A(1) |
N/A(1) |
Waste / Chemical Management |
01/03/2016 |
Provide
tarpaulin sheet at underneath of the parts of breaker and clear the oil
leakage at P68. |
Rectification/improvement
was observed during the follow-up audit session on 8 March 2016. |
01/03/2016 |
Provide
drip tray for the oil containers at P76. |
Rectification/improvement
was observed during the follow-up audit session on 8 March 2016. |
|
08/03/2016 |
Clear
the rubbish at near the waste skip at Portion C (P111). |
Rectification/improvement
was observed during the follow-up audit session on 15 March 2016. |
|
15/03/2016 |
Provide
spill kit at the bridge surface at P19. |
Rectification/improvement
was observed during the follow-up audit session on 22 March 2016. |
|
15/03/2016 |
Provide
drip tray for the chemical containers at the bridge surface at P19. |
Rectification/improvement
was observed during the follow-up audit session on 22 March 2016. |
|
15/03/2016 |
Provide
drip tray for the chemical containers at P91. |
Rectification/improvement
was observed during the follow-up audit session on 22 March 2016. |
|
22/03/2016 |
Provide
spill kit at P47 to clear the oil leakage and the oil pump should be properly
placed inside the drip tray. |
Rectification/improvement
was observed during the follow-up audit session on 29 March 2016. |
|
22/03/2016 |
Clear
the accumulated rubbish at P46. |
Rectification/improvement
was observed during the follow-up audit session on 29 March 2016. |
|
29/03/2016 |
Clear
the oily water at the drip tray as chemical wastes at P75. |
Rectification/improvement
was observed during the follow-up audit session on 5 April 2016. |
|
Landscape & Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
N/A(1) |
N/A(1) |
N/A(1) |
Other |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural Heritage (Sha Lo Wan (West) Archaeological Site) |
29/3/2016 |
N/A(1) |
N/A(1) |
Remark: N/A(1)
- No major environmental deficiency was identified during the site
inspection in the reporting month