Table 7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water Quality |
05/04/2016 |
Properly deploy the
silt curtain at P93. |
Rectification/improvement
was observed during the follow-up audit session on 12 April 2016. |
05/04/2016 |
To avoid the leakage
of construction runoff from the deck surface to the marine water at P91. |
Rectification/improvement
was observed during the follow-up audit session on 12 April 2016. |
|
05/04/2016 |
To avoid the discharge
of wheel washing water to the marine water at P88. |
Rectification/improvement
was observed during the follow-up audit session on 12 April 2016. |
|
05/04/2016 |
Clear the floating
rubbish at near P81 and P82. |
Rectification/improvement
was observed during the follow-up audit session on 12 April 2016. |
|
19/04/2016 |
Properly erect the sand bag bund to avoid the
leakage of wastewater to the sea at WA4. |
Rectification/improvement
was observed during the follow-up audit session on 26 April 2016. |
|
26/04/2016 |
To replace the worn sand bags at near the
grouting enclosure at P112 (deck-surface). |
Rectification/improvement
was observed during the follow-up audit session on 3 May 2016. |
|
Ecology |
N/A(1) |
N/A(1) |
N/A(1) |
Air Quality |
N/A(1) |
N/A(1) |
N/A(1) |
Noise |
N/A(1) |
N/A(1) |
N/A(1) |
Waste / Chemical Management |
05/04/2016 |
Properly
repair the waste skip or replace with the new one at P111. |
Rectification/improvement
was observed during the follow-up audit session on 12 April 2016. |
05/04/2016 |
Provide
drip tray for the chemical containers at WA4. |
Rectification/improvement
was observed during the follow-up audit session on 12 April 2016. |
|
12/04/2016 |
Clear
the accumulated construction wastes at near P106 (Portion C). |
Rectification/improvement
was observed during the follow-up audit session on 19 April 2016. |
|
12/04/2016 |
The
handrails should be properly erected at P105, P91 and P84 to avoid falling to
the seawall area. |
Rectification/improvement
was observed during the follow-up audit session on 19 April 2016. |
|
19/04/2016 |
Clear
the oily water at the drip tray as chemical waste at P64. |
Rectification/improvement
was observed during the follow-up audit session on 26 April 2016. |
|
19/04/2016 |
To
seal the hole of drip tray for generator at P64. |
Rectification/improvement
was observed during the follow-up audit session on 26 April 2016. |
|
19/04/2016 |
Clear
the paint on the soil as chemical waste at WA4. |
Rectification/improvement
was observed during the follow-up audit session on 26 April 2016. |
|
19/04/2016 |
Clear
the oily water at the steel container for oil drum at WA4. |
Rectification/improvement
was observed during the follow-up audit session on 26 April 2016. |
|
26/04/2016 |
Clear
the accumulated rubbish at P70. |
Rectification/improvement
was observed during the follow-up audit session on 3 May 2016. |
|
26/04/2016 |
Provide
spill kit and clear the oil spillage at near the drip tray for generator at
P69. |
Rectification/improvement
was observed during the follow-up audit session on 3 May 2016. |
|
Landscape & Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
26/04/2016 |
Properly display the Environmental Permit and
construction noise permit at P70. |
Rectification/improvement
was observed during the follow-up audit session on 3 May 2016. |
Other |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural Heritage (Sha Lo Wan (West) Archaeological Site) |
N/A(2) |
N/A(2) |
N/A(2) |
Remark: N/A(1)
- No major environmental deficiency was identified during the site
inspection in the reporting month.
N/A(2) No archaeological site inspection