Table 7.1       Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

05/04/2016

Properly deploy the silt curtain at P93.

Rectification/improvement was observed during the follow-up audit session on 12 April 2016.

05/04/2016

To avoid the leakage of construction runoff from the deck surface to the marine water at P91.

Rectification/improvement was observed during the follow-up audit session on 12 April 2016.

05/04/2016

To avoid the discharge of wheel washing water to the marine water at P88.

Rectification/improvement was observed during the follow-up audit session on 12 April 2016.

05/04/2016

Clear the floating rubbish at near P81 and P82.

Rectification/improvement was observed during the follow-up audit session on 12 April 2016.

19/04/2016

Properly erect the sand bag bund to avoid the leakage of wastewater to the sea at WA4.

Rectification/improvement was observed during the follow-up audit session on 26 April 2016.

26/04/2016

To replace the worn sand bags at near the grouting enclosure at P112 (deck-surface).

Rectification/improvement was observed during the follow-up audit session on 3 May 2016.

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

N/A(1)

N/A(1)

N/A(1)

Noise

N/A(1)

N/A(1)

N/A(1)

Waste / Chemical Management

05/04/2016

Properly repair the waste skip or replace with the new one at P111.

Rectification/improvement was observed during the follow-up audit session on 12 April 2016.

05/04/2016

Provide drip tray for the chemical containers at WA4.

Rectification/improvement was observed during the follow-up audit session on 12 April 2016.

12/04/2016

Clear the accumulated construction wastes at near P106 (Portion C).

Rectification/improvement was observed during the follow-up audit session on 19 April 2016.

12/04/2016

The handrails should be properly erected at P105, P91 and P84 to avoid falling to the seawall area.

Rectification/improvement was observed during the follow-up audit session on 19 April 2016.

19/04/2016

Clear the oily water at the drip tray as chemical waste at P64.

Rectification/improvement was observed during the follow-up audit session on 26 April 2016.

19/04/2016

To seal the hole of drip tray for generator at P64.

Rectification/improvement was observed during the follow-up audit session on 26 April 2016.

19/04/2016

Clear the paint on the soil as chemical waste at WA4.

Rectification/improvement was observed during the follow-up audit session on 26 April 2016.

19/04/2016

Clear the oily water at the steel container for oil drum at WA4.

Rectification/improvement was observed during the follow-up audit session on 26 April 2016.

26/04/2016

Clear the accumulated rubbish at P70.

Rectification/improvement was observed during the follow-up audit session on 3 May 2016.

26/04/2016

Provide spill kit and clear the oil spillage at near the drip tray for generator at P69.

Rectification/improvement was observed during the follow-up audit session on 3 May 2016.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

26/04/2016

Properly display the Environmental Permit and construction noise permit at P70.

Rectification/improvement was observed during the follow-up audit session on 3 May 2016.

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

N/A(2)

N/A(2)

N/A(2)

Remark: N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.

N/A(2) No archaeological site inspection was conducted in the reporting month.