Table 7.1       Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

03/05/2016

Clear the rubbish in the sedimentation tank at near P110.

Rectification/improvement was observed during the follow-up audit session on 10 May 2016.

10/05/2016

Provide mitigation measures to avoid to leakage of wastewater at ro-ro barge to the sea (Kam Shun 338)

Rectification/improvement was observed during the follow-up audit session on 17 May 2016.

10/05/2016

Properly deploy the silt curtain at P68.

Rectification/improvement was observed during the follow-up audit session on 17 May 2016.

17/05/2016

Muddy water should be cleared near P37 (deck-surface) to prevent discharging into the sea.

Rectification/improvement was observed during the follow-up audit session on 24 May 2016.

17/05/2016

Wastewater should be treated properly before discharging into the designated discharging point at P94.

Rectification/improvement was observed during the follow-up audit session on 24 May 2016.

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

03/05/2016

Properly cover the stockpile of dusty material at P86.

Rectification/improvement was observed during the follow-up audit session on 10 May 2016.

24/05/2016

Clear the oil leakage and dusty materials around the segment carrier at P41 (deck-surface).

Rectification/improvement was observed during the follow-up audit session on 31 May 2016.

Noise

N/A(1)

N/A(1)

N/A(1)

Waste / Chemical Management

03/05/2016

Clear the accumulated rubbish at between P82 and P83.

Rectification/improvement was observed during the follow-up audit session on 10 May 2016.

03/05/2016

Proper container and drip tray should be provided for storing chemical oil at P91, P93 and P108.

Rectification/improvement was observed during the follow-up audit session on 10 May 2016.

03/05/2016

Clear the chemical oil container that without cover at P112. (deck-surface)

Rectification/improvement was observed during the follow-up audit session on 10 May 2016.

10/05/2016

Properly store the chemical containers at near the site office containers at WA4.

Rectification/improvement was observed during the follow-up audit session on 17 May 2016.

10/05/2016

Clear the oil spillage at the platform at P69.

Rectification/improvement was observed during the follow-up audit session on 17 May 2016.

10/05/2016

Clear the accumulated chemical containers as chemical wastes at P62 (deck-surface).

Rectification/improvement was observed during the follow-up audit session on 17 May 2016.

17/05/2016

To clear the oil stain properly as chemical waste at the section between P39 and P40. (deck-suface)

Rectification/improvement was observed during the follow-up audit session on 24 May 2016.

24/05/2016

Clear the oil leakage and provide drip tray for the oil drum at between P47 & P46 (deck-surface).

Rectification/improvement was observed during the follow-up audit session on 31 May 2016.

24/05/2016

Clear the oil leakage and dusty materials around the segment carrier at P41 (deck-surface).

Rectification/improvement was observed during the follow-up audit session on 31 May 2016.

24/05/2016

Clear the oil leakage around the steel container at P30 (deck-surface).

Rectification/improvement was observed during the follow-up audit session on 31 May 2016.

31/05/2016

Properly store the chemicals at P71 (deck-surface) to avoid falling at height.

Rectification/improvement was observed during the follow-up audit session on 7 June 2016.

31/05/2016

Provide spill kit (i.e. oil absorbent) at P17 (deck-surface).

Rectification/improvement was observed during the follow-up audit session on 7 June 2016.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

N/A(1)

N/A(1)

N/A(1)

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

N/A(2)

N/A(2)

N/A(2)

Remark: N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.

N/A(2) No archaeological site inspection was conducted in the reporting month.