Table 7.1       Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

20/09/2016

Silt curtain near P68 should be repaired properly.

Rectification/improvement was observed during the follow-up audit session on 27 September 2016.

27/09/2016

Sandbag bunds should be provided before kicking plates to prevent leakage from grouting works for P53 to P58.

Rectification/improvement was observed during the follow-up audit session on 4 October 2016.

27/09/2016

Stagnant water in the deck holes of the bridge should be cleared properly at P53 to P59.

Rectification/improvement was observed during the follow-up audit session on 4 October 2016.

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

06/09/2016

Cement bags should be covered properly near P107.

Rectification/improvement was observed during the follow-up audit session on 13 September 2016.

Noise

N/A(1)

N/A(1)

N/A(1)

Waste / Chemical Management

06/09/2016

To properly clear the oil leakage as chemical waste and provide drip trays for oil containers near P47, P34 and P30.

Rectification/improvement was observed during the follow-up audit session on 13 September 2016.

06/09/2016

Waste water inside drip trays near P44 and P37 should be cleared as chemical waste.

Rectification/improvement was observed during the follow-up audit session on 13 September 2016.

06/09/2016

Chemical material should be properly stored in chemical storage area at Portion C.

Rectification/improvement was observed during the follow-up audit session on 13 September 2016.

13/09/2016

Drip trays should be provided to oil containers at P47 to prevent oil leakage.

Rectification/improvement was observed during the follow-up audit session on 20 September 2016.

13/09/2016

General refuse near P82 should be cleared to avoid accumulation.

Rectification/improvement was observed during the follow-up audit session on 20 September 2016.

27/09/2016

Drip trays for chemical containers should be plugged and suitable labels should be provided to chemical containers of P57.

Rectification/improvement was observed during the follow-up audit session on 4 October 2016.

27/09/2016

House-keeping should be enhanced at P58 and P80.

Rectification/improvement was observed during the follow-up audit session on 4 October 2016.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

N/A(1)

N/A(1)

N/A(1)

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

20/09/2016

N/A(1)

N/A(1)

Remark: N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.