1.
This is the 45th monthly Environmental Monitoring and Audit
(EM&A) Report prepared by Cinotech Consultants
Limited for the project
¡§Contract No. HY/2011/09 ¡V Hong
Kong-Zhuhai-Macao Bridge Hong Kong Link Road ¡V Section between HKSAR Boundary
and Scenic Hill¡¨ (hereinafter called the ¡§Contract¡¨). This report documents the findings of EM&A Works conducted in
October 2016.
Environmental Monitoring and Audit Progress
2.
A summary of the monitoring activities in this reporting month is listed
in Table I below:
Table I Summary
Table for Monitoring Activities in the Reporting Month
Parameter(s) |
Date(s) |
1-hr
TSP Monitoring |
6th, 12th,
18th, 24th and 28th October 2016 |
24-hr
TSP Monitoring |
6th, 12th,
18th, 24th and 28th October 2016 |
Noise
Monitoring |
7th, 13th,
19th and 25th October 2016 |
Water
Quality Monitoring |
3rd, 5th,
7th, 11th, 13th, 15th, 17th,
19th, 22nd, 24th, 26th, 28th
and 31st October 2016 |
14th and 20th
October 2016 |
|
Environmental
Site Inspection |
4th, 11th,
18th and 25th October 2016 |
Breaches of Action and Limit Levels
3.
Summary of the environmental exceedances of the reporting month is
tabulated in Table II.
Table II Summary
Table for Events Recorded in the Reporting Month
Environmental Monitoring |
Parameter |
No. of Exceedance |
Total
No. of Exceedance |
No. of Exceedance related to the Construction Activities of this Contract |
Total No. of Exceedance related to the Construction Activities of this Contract |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
||||
Air Quality |
1-hr TSP |
0 |
0 |
0 |
0 |
0 |
0 |
24-hr TSP |
0 |
0 |
0 |
0 |
0 |
0 |
|
Noise |
Leq(30min) |
0 |
0 |
0 |
0 |
0 |
0 |
Water Quality |
Dissolved Oxygen (DO)
(Surface & Middle) |
0 |
0 |
0 |
0 |
0 |
0 |
Dissolved Oxygen (DO)
(Bottom) |
0 |
0 |
0 |
0 |
0 |
0 |
|
Turbidity |
0 |
0 |
0 |
0 |
0 |
0 |
|
Suspended Solids (SS) |
10 |
1 |
11 |
0 |
0 |
0 |
1-hour
TSP Monitoring
4.
All 1-hour TSP monitoring was conducted as scheduled in the reporting month. No Action/Limit Level exceedance was
recorded.
24-hour
TSP Monitoring
5.
All 24-hour TSP monitoring was conducted as scheduled in the reporting month. No Action/Limit Level exceedance was
recorded.
Construction
Noise
6.
All construction noise monitoring was conducted as scheduled in the
reporting month. No Action/Limit Level exceedance was recorded.
Water Quality
7.
All water quality monitoring was conducted as scheduled in the reporting
month. There are ten Action Level and one Limit Level exceedances were recorded
for suspended solids. No Action/Limit Level exceedance for dissolved oxygen and
turbidity were recorded.
Complaint Log
8.
No environmental complaint was received in the reporting month.
Notification of
Summons and Successful Prosecutions
9.
No notification of summons and successful prosecution was received in
the reporting month.
10.
This report has been developed in compliance with the reporting
requirements for the subsequent monthly EM&A Report as required by the
EM&A Manual for Hong Kong Link Road (EM&A Manual).
11.
Major site activities for
the coming reporting month will include:
WA4
¡P Cross Beam Precast Shell
construction
Ancillary and
Associated Facilities
¡P E&M installation
¡P E&M ducting
installation
¡P Construction of Load
Centre (CL1)
¡P Installation of
carrier drains
¡P Installation of
precast parapet skins
¡P Erection of Radar
Platform
¡P Construction of median
and side barriers
¡P Construction of
longitudinal stitching
¡P Erection of gantry
posts for Sign gantry
¡P Reinstatement of slope
area and drainage works
¡P Reinstatement of
sloping seawall
Marine Viaduct (P0 to
P80)
Deck Erection
¡P Segment erection
¡P Erection of SOP segments
¡P Erection of cantilever
¡P Construction of cross beam precase shell
¡P In-situ RC works
¡P Erection of precase SOP unit to Turnaround
¡P Alignment and levels adjustment
¡P Construction of temporary
platform
External Prestressing Tendon Installation
Internal Prestressing Grouting