8.1
Summary of exceedance is provided in Appendix L.
8.2
No Action/Limit Level exceedance was recorded for air quality, construction
noise and water quality.
8.3
There are ten Action Level and one Limit Level
exceedances for suspended solids were recorded. No Action/Limit Level exceedance
for dissolved oxygen and turbidity were recorded.
8.4
According to the investigation, the exceedances are
considered not due to the Contract due to the following reasons:
1)
No pollution discharge from construction activity was observed;
2)
Control Station value already exceeded either the Baseline Action or
Limit Levels;
3)
Monitoring station is situated at the upstream of the construction
sites;
4)
Localized sediment plume due to the rough water condition was observed;
and
5)
Sediment plume due to natural fluctuation of shallow water was observed.
Summary of Environmental Complaint
8.5
No environmental related complaint was received in the reporting month. The
Complaint Log is attached in Appendix P.
8.6
There was one prosecution or notification of summons received since the Contract
commencement. Summary of successful prosecution as attached in Appendix Q.