9.1
Major site activities for the coming reporting month will include:
WA4
¡P
Cross Beam Precast Shell construction
Ancillary and
Associated Facilities
¡P E&M installation
¡P E&M ducting
installation
¡P Construction of Load
Centre (CL1)
¡P Installation of
carrier drains
¡P Installation of
precast parapet skins
¡P Erection of Radar
Platform
¡P Construction of median
and side barriers
¡P Construction of
longitudinal stitching
¡P Erection of gantry
posts for Sign gantry
¡P Reinstatement of slope
area and drainage works
¡P Reinstatement of
sloping seawall
Marine Viaduct (P0 to
P80)
Deck Erection
¡P
Segment erection
¡P
Erection of SOP segments
¡P
Erection of cantilever
¡P
Construction of cross beam precase shell
¡P
In-situ RC works
¡P
Erection of precase SOP unit to Turnaround
¡P
Alignment and levels adjustment
¡P
Construction of temporary platform
External Prestressing Tendon Installation
Internal Prestressing Grouting
9.2
The tentative environmental monitoring schedule for the next month is
shown in Appendix D.
9.3
A tentative construction programme is provided
in Appendix A.