2               Contract INFORMATION

Background

2.1         The proposed Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road (HKLR) is 12km long connecting the Hong Kong-Zhuhai-Macao Bridge (HZMB) at the HKSAR Boundary with the Hong Kong Boundary Crossing Facilities (HKBCF) situated at the north eastern waters of the Hong Kong International Airport, opening a new and direct connection route between Hong Kong, Macao and the Western Pearl River Delta. 

2.2         The HKLR comprises a 9.4km long viaduct section from the HKSAR boundary to Scenic Hill on the Airport Island; a 1km tunnel section to the reclamation formed along the east coast of the Airport Island and a 1.6km long at-grade road section on the reclamation connecting to the HKBCF. The tunnel section of HKLR will pass under Scenic Hill, Airport Road and Airport Railway to minimize the environmental and visual impacts to Tung Chung residents.

2.3         An application (No ESB-110/2003) for an Environmental Impact Assessment (EIA) Study Brief under Section 5(1) of the Environmental Impact Assessment Ordinance (EIAO) was submitted by Highways Department (the Project Proponent) on 8 October 2003 with a Project Profile (No. No. PP-201/2003) for the Hong Kong - Zhuhai - Macao Bridge Hong Kong Section and North Lantau Highway Connection. The Hong Kong - Zhuhai - Macao Bridge Hong Kong Section and North Lantau Highway Connection has subsequently been renamed as HKLR.  EPD issued an EIA Study Brief (No: ESB-110/2003) in November 2003 to the Project Proponent to carry out an EIA study.

2.4         An EIA Study (Reg. No. AEIAR-144/2009) has been undertaken to provide information on nature and extent of environmental impacts arising from the construction and operation of HKLR. The Environmental Permit was issued on 4 November 2009 (Permit No. EP-352/2009). Pursuant to Section 13 of the EIAO, the Director of Environmental Protection amends the Environmental Permit (No. EP-352/2009) based on the Application No. VEP-339/2011 and the environmental Permit (Permit No. EP-352/2009/A) was issued on 9 November 2011 for HKLR to the Highways Department as the Permit Holder. Subsequently, the Director of Environmental Protection amends the Environmental Permits (No. EP-352/2009/A, EP-352/2009/B, EP-352/2009/C) based on the Application No. VEP-409/2013, VEP-411/2013 and VEP-459/2014 respectively. The environmental Permit (Permit No. EP-352/2009/D) was then issued on 22 December 2014.

2.5         Figure 1a-d  shows the layout of the Contract and the scope of the Contract works comprises the following major items:

 

¡P           a dual 3-lane carriageway in the form of viaduct from the HKSAR boundary (connecting with the HZMB Main Bridge) to the Scenic Hill (connecting with the tunnel under separate Contract No. HY/2011/03), of approximately 9.4km in length with a hard shoulder for each bound of carriageway and a utilities trough on the outer edge of each bound of viaducts;

¡P           a grade-separated turnaround facility located near San Shek Wan, composed of sliproads in the form of viaduct with single-lane carriageway bifurcated from the HKLR mainline with an elevated junction above the mainline;

¡P           provision of ancillary facilities including, but not limited to, meteorological enhancement measures including the provisioning of anemometers and modification of the wind profiler station at hillside of Sha Lo Wan, provisioning of a compensatory marine radar, and provisioning of security systems; and

¡P           associated civil, structural, geotechnical, marine, environmental protection, landscaping, drainage and highways electrical and mechanical (E&M) works, street lightings, traffic aids and sign gantries, marine navigational aids, ship impact protection system, water mains and fire hydrants, lightning protection system, structural health monitoring and maintenance management system (SHM&MMS), supervisory control and data acquisition (SCADA) system, as well as operation and maintenance provisions of viaducts, provisioning of facilities for installation of traffic control and surveillance system (TCSS), provisioning of facilities for installation of telecommunication cables/equipments and reprovisioning works of affected existing facilities/utilities.

Contract Organisation

2.6         Different parties with different levels of involvement in the Contract organization include:

Ÿ   Supervising Officer¡¦s Representative (SOR) ¡V Ove Arup & Partners Hong Kong Limited (ARUP)

Ÿ   Contractor ¡VDragages -China Harbour-VSL JV   (DCVJV)

Ÿ   Environmental Team (ET) ¡V Cinotech Consultants Ltd. (Cinotech)

 

2.7         The proposed project organization and lines of communication with respect to the on-site environmental management structure are shown in Figure 2. The key personnel contact names and numbers are summarized in Table 2.1.

Table 2.1        Key Contacts of the Contract

Party

Position

Position

Phone No.

Fax No.

SOR (ARUP)

CRE

Mr. Michael Chan

3767 5803

3767 5922

Mr. Colin Meadows

3767 5801

ENPO/IEC

(Ramboll Environ)

Environmental Project Office Leader

Mr. Y. H Hui

3465 2888

3465 2899

Independent Environmental Checker

Mr. Antony Wong

3465 2888

3465 2899

Contractor (DCVJV)

Deputy Project Director

Mr. W.K Poon

3121 6638

3121 6688

Environmental Officer

Mr. CHU Chung Sing

3121 6672

24-hour Hotline

--

6898 6161

--

ET

(Cinotech)

Environmental Team Leader

Dr. Priscilla Choy

2151 2089

3107 1388

 

2.8         Ramboll Environ Hong Kong Limited (Ramboll Environ) is employed by the Highways Department as the Independent Environmental Checker (IEC) and Environmental Project Office (ENPO) for the Project.

Construction Programme

 

2.9         A copy of Contractor¡¦s construction programme is provided in Appendix A.

Summary of Construction Works Undertaken During Reporting Month

2.10     The major site activities undertaken in the reporting month included:

Ancillary and Associated Facilities

(a)    P115 & P114 interface area - Reinstatement of slope area temporarily on-hold pending for drainage and reinstatement detailing coupling with the additional maintenance path;  

(b)   Reinstatement of sloping seawall at P81 was completed, P103 and P104 in progress;

(c)    The precast parapet progress is summarized as follows:

Item

Number in this month

Cumulative No. of Precast Parapet Completed

(up to end of month)

Parapet Casting

448

2962

Parapet Installation

493

1650

In-situ concreting works

1168.71

3910

 

(d)   The central barrier progress is summarized as follows:

Type

Item

Monthly Workdone

Cumulative Workdone

(up to end of month)

Central barrier (precast method)

Precast

925

2866

Installation

164

696

Central barrier (precast + in-situ method)

In-fill concreting #

366

817

# ¡§In-fill concreting¡¨ will be carried out after installation of precast units or formworks for precast method and in-situ method respectively. After the in-fill concreting works, the central barrier shall be regarded as completed.

 

(e)    The side barrier progress is summarized as follows:

Type

Item

Monthly Workdone

Cumulative Workdone

(up to 28th of month)

Side barrier (precast method)

Precast

1000

1900

Installation

253

658

Side barrier (precast + in-situ method)

In-fill concreting #

888

1626

 

(f)    Construction of the longitudinal stitching from P44 to P39 is in progress;

(g)    Installation of carrier drains from P115 to P93 is in progress;

(h)   Erection of Radar Platform at P20 is in progress;

(i)     Sealing of deck openings is in progress;

(j)     Waterproofing and asphalt laying at ML18 is in progress.

(k)   E&M installation at ML9 continues;

(l)     E&M ducting installation at ML5 commenced;

(m) E&M installation in Transformer Room and HV Room in SHT Building continues;

(n)   E&M cable tray installation at SHT building commenced;

(o)   E&M service ducting installation in deck void at ML19 commenced.

 

Deck Erection

(a)      Segment erection in December 2016:

Type

Location of Segments erected in this reporting period

Number of Segments erected in this reporting period

Cumulative No. of Segments erected

(up to 28th of each month)

Launching Gantry 1 (LG1)

All completed

0

1020

Launching Gantry 2

(LG2)

P04, P03, P02 & P01

160

1756

Lifting Frames 1

(LF1), Hanger Beam (HB) and Crane Barge

P70, P74, P75, P79, P80 and P81

86

904

Lifting Frames 1

(LF1), Hanger Beam (HB) and Crane Barge

P59, P60 and P80

33

799

Typical Span SOP

No erection activity this month

0

240

Long Span SOP

P69

6

96

Movement Joint (MJ) SOP Airport Channel

P78

4

20

Short Span (SS) and Movement Joint (MJ) SOP type B

All completed

0

16

Typical Span

Segment type B

P53L & P53R

43

81

Segment Lifter / Crane Barge

P68

3

12

 

External Prestressing Tendon Installation

Viaduct

Activities

Quantities

Unit

Done %

 

ML19C

Threading

Stressing

Grouting

47.55

12

9.42

T

U

M3

100%

100%

100%

 

ML19R

Threading

Stressing

Grouting

48.65

12

9.64

T

U

M3

100%

100%

100%

 

ML19L

Threading

Stressing

Grouting

46.91

12

9.29

T

U

M3

100%

100%

100%

 

ML18R

Threading

Stressing

Grouting

77.90

18

15.38

T

U

M3

100%

100%

100%

 

ML18L

Threading

Stressing

Grouting

76.40

18

15.08

T

U

M3

100%

100%

100%

 

ML17R

Threading

Stressing

Grouting

63.09

16

12.44

T

U

M3

100%

100%

100%

 

ML17L

Threading

Stressing

Grouting

62.86

16

12.39

T

U

M3

100%

100%

100%

 

ML16R

Threading

Stressing

Grouting

56.69

15

9.91

T

U

M3

100%

100%

78%

 

ML16L

Threading

Stressing

Grouting

87.34

18

17.2

T

U

M3

100%

100%

100%

 

ML15R

Threading

Stressing

Grouting

108.74

18

17.2

T

U

M3

87.77%

44.44%

0%

ML15L

Threading

Stressing

Grouting

106.26

18

21.45

T

U

M3

87.78%

44.44%

0%

ML11R

Threading

Stressing

Grouting

164.83

24

32.72

T

U

M3

50%

0%

0%

ML11L

Threading

Stressing

Grouting

166.74

24

33.10

T

U

M3

50%

0%

0%

ML10R

 

Threading

Stressing

Grouting

121.69

16

24.17

T

U

M3

0%

0%

0%

ML10L

Threading

Stressing

Grouting

122.16

16

24.26

T

U

M3

0%

0%

0%

ML09R

Threading

Stressing

Grouting

140.32

32

27.73

T

U

M3

0%

0%

0%

ML09L

Threading

Stressing

Grouting

129.46

32

25.56

T

U

M3

0%

0%

0%

ML08R

Threading

Stressing

Grouting

85.72

24

16.89

T

U

M3

100%

0%

0%

ML08L

Threading

Stressing

Grouting

85.72

24

16.89

T

U

M3

100%

0%

0%

 

ML07R

Threading

Stressing

Grouting

129.58

32

25.59

T

U

M3

17%

0%

0%

 

ML07L

Threading

Stressing

Grouting

140.43

32

27.76

T

U

M3

17%

0%

0%

 

ML06R

Threading

Stressing

Grouting

113.04

24

22.35

T

U

M3

100%

100%

100%

 

ML06L

Threading

Stressing

Grouting

113.04

24

22.35

T

U

M3

100%

100%

100%

 

ML05R

Threading

Stressing

Grouting

113.68

24

22.48

T

U

M3

100%

100%

100%

 

ML05L

Threading

Stressing

Grouting

112.39

24

22.22

T

U

M3

100%

100%

100%

 

ML04R

Threading

Stressing

Grouting

113.04

24

22.35

T

U

M3

100%

100%

100%

 

ML04L

Threading

Stressing

Grouting

113.04

24

22.35

T

U

M3

100%

100%

100%

 

ML03R

Threading

Stressing

Grouting

199.65

32

39.615

T

U

M3

100%

100%

0%

 

ML03L

Threading

Stressing

Grouting

201.13

32

29.9

T

U

M3

100%

100%

0%

 

ML02R

Threading

Stressing

Grouting

113.72

24

22.49

T

U

M3

100%

95%

0%

 

ML02L

Threading

Stressing

Grouting

113.73

24

22.49

T

U

M3

100%

100%

0%

ML1R

Threading

Stressing

Grouting

113.72

24

22.49

T

U

M3

30%

0%

0%

ML1L

Threading

Stressing

Grouting

113.73

24

22.49

T

U

M3

10%

0%

0%

 

Internal Prestressing Grouting Progress

Viaduct

Activities

Quantities

Unit

Done %

ML19C

Air test & Grouting

14.09

M3

100%

ML19R

Air test & Grouting

14.90

M3

100%

ML19L

Air test & Grouting

13.90

M3

100%

ML18R

Air test & Grouting

25.24

M3

100%

ML18L

Air test & Grouting

24.76

M3

96%

ML17R

Air test & Grouting

23.47

M3

100%

ML17L

Air test & Grouting

23.46

M3

100%

ML16R

Air test & Grouting

36.54

M3

99%

ML16L

Air test & Grouting

35.46

M3

99%

ML15R

Air test & Grouting

39.34

M3

45%

ML15L

Air test & Grouting

39.69

M3

44%

ML09R

Air test & Grouting

63.27

M3

24%

ML09L

Air test & Grouting

57.86

M3

32%

ML08R

Air test & Grouting

36.58

M3

31%

ML08L

Air test & Grouting

36.56

M3

31%

ML07R

Air test & Grouting

59.61

M3

32%

ML07L

Air test & Grouting

60.05

M3

40%

ML06R

Air test & Grouting

58.31

M3

100%

ML06L

Air test & Grouting

58.31

M3

100%

ML05R

Air test & Grouting

58.62

M3

100%

ML05L

Air test & Grouting

58.01

M3

100%

ML04R

Air test & Grouting

57.64

M3

86%

ML04L

Air test & Grouting

57.69

M3

92%

ML03R

Air test & Grouting

126.65

M3

0%

ML03L

Air test & Grouting

127.63

M3

0%

ML02R

Air test & Grouting

62.74

M3

0%

ML02L

Air test & Grouting

62.74

M3

0%

 

Turnaround Facilities

(a)    In-situ SOP at P56N & P56S at Turnaround were cast;

(b)   Construction of BG03 and steel fixing for top slab is in progress;

(c)    Construction of BG02 and steel fixing base slab is in progress;

(d)   BG04 and CB01, 02, 03 & 04 were cast at Pan Yu casting yard.

 

Precast Segment

(a)      Segment Casting:

Item

Number in this reporting period

Cumulative No. of Precast Segment Completed

(up to 28th of each month)

Segment Cast

22

5714

Remarks: Cumulative no. excludes the 7 nos. recast following damages to segments due to toppled incident at the casting yard.

(b)     The last segment was completed on 8 December 2016

(c)      Last segment topping ceremony was held with HyD on 12 December 2016.

 

Delivery for Precast Concrete Elements (by barge)

(a)      Precast Deck Segments:

-     Number of barges engaged in this period: 18.

-      Number of deck segment deliveries in this period: 49 trips.

-      Cumulative number of deck segment deliveries: 1001 trips.

Segment Types

Segment Delivered in this reporting period

Cumulative No. of Precast Segment Delivered

(up to 28th of each month)

A

96

2438

B

48

112

C

100

1192

D

6

216

E

0

1014

Status of Environmental Licences, Notification and Permits

 

2.11     A summary of the relevant permits, licences, and/or notifications on environmental protection for this Contract is presented in Table 2.2.

Table 2.2        Status of Environmental Licences, Notification and Permits

Permit / License No.

Valid Period

Status

From

To

Environmental Permit (EP)

EP-352/2009/D

22/12/2014

N/A

Valid

Consruction Noise Permit (CNP)

P101 ¡V P114: GW-RS1216-16

09/12/2016 (19:00)

31/12/2016 (05:30)

Valid

P84 ¡V P115: GW-RS0627-16

17/06/2016 (19:00)

16/12/2016 (24:00)

Cancelled on 16 December 2016

P84 ¡V P115: GW-RS1248-16

16/12/2016 (19:00)

15/06/2017 (23:00)

Valid

P68 ¡V P69, P79 ¡V P80:

GW-RS0945-16

17/09/2016 (01:30)

16/12/2016 (07:00)

Cancelled on 16 December 2016

P69, P79 ¡V P83:

GW-RS1269-16

21/12/2016 (01:30)

20/03/2017 (07:00)

Valid

P69-P83: GW-RS1040-16

06/10/2016 (19:00)

05/04/2017 (24:00)

Valid

P0-P68: GW-RS1039-16

06/10/2016 (19:00)

05/04/2017 (24:00)

Valid

PWA4: GW-RW0576-16

07/10/2016 (00:00)

04/04/2017 (24:00)

Valid

Notification pursuant to Air Pollution Control (Construction Dust) Regulation

345773

04/06/2012

N/A

Receipt acknowledged by EPD

Billing Account for Construction Waste Disposal

A/C# 7015341

(Construction Site)

11/06/2012

N/A

Valid

Registration of Chemical Waste Producer

WPN 5213-951-D2499-01

18/07/2012

N/A

Valid

Effluent Discharge License under Water Pollution Control Ordinance

WA6A (DCVJV site office): WT00014053-2012

12/09/2012

30/09/2017

Valid

WA6B  (SOR site office): WT00014447-2012

30/10/2012

31/10/2017

Valid

WA3: WT00015118-2013

30/01/2013

31/01/2018

Valid

Portion C: WT00023624-2016

17/02/2016

28/02/2018

Valid

Portion A: WT00016076-2013

21/05/2013

31/05/2018

Valid

WA4B: WT00014750-2012

12/08/2013

31/08/2018

Valid

WA7: WT00015722-2013

16/01/2013

31/01/2019

Site was handed over on 30 Jun 2016

P0 ¡V P80: WT00018203-2014

30/01/2013

31/01/2019

Valid

P114: WT00018631-2014

31/03/2014

31/03/2019

Valid

P81-P83: WT00023608-2016

01/04/2016

31/07/2020

Valid