1.1
Cinotech Consultants Limited (Cinotech)
was appointed by Dragages -China Harbour-VSL JV (hereinafter called “the Contractor”) as the Environmental Team (ET)
to undertake the Environmental Monitoring and Audit (EM&A) programme during construction phase of the Contract No.
HY/2011/09 – Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road – Section
between HKSAR Boundary and Scenic Hill” (hereinafter
called the “Contract”) in
accordance with EP Conditions 2.1.
1.2
This is the 49th EM&A report which summarises
the impact monitoring results and audit findings for the EM&A programme in February 2017.
1.3
The structure of the report is as follows:
Section 1: Introduction
- purpose and structure of the report.
Section 2: Contract
Information - summarises background and scope of
the Contract, site description, project organization and contact details,
construction programme, the construction works
undertaken and the status of Environmental Permits/Licenses during the reporting
month.
Section 3: Air
Quality Monitoring - summarises the monitoring
parameters, monitoring programmes, monitoring
methodologies, monitoring frequency, monitoring locations, Action and Limit
Levels, monitoring results and Event / Action Plans.
Section 4: Noise
Monitoring - summarises the monitoring
parameters, monitoring programmes, monitoring
methodologies, monitoring frequency, monitoring locations, Action and Limit
Levels, monitoring results and Event / Action Plans.
Section 5: Water
Quality Monitoring - summarises the monitoring
parameters, monitoring programmes, monitoring
methodologies, monitoring frequency, monitoring locations, Action and Limit
Levels, monitoring results and Event / Action Plans.
Section 6: Dolphin-Related
Monitoring - summarises the monitoring
parameters, monitoring programmes, monitoring
methodologies, monitoring frequency, monitoring locations and monitoring
results.
Section 7: Environmental
Site Inspection - summarises the audit findings
of the weekly site inspections undertaken within the reporting month.
Section 8: Environmental
Non-conformance - summarises any monitoring
exceedance, environmental complaints, environmental summons and successful
prosecutions within the reporting month.
Section 9: Future Key Issues - summarises the impact forecast and monitoring schedule for
the next three months.
Section 10: Conclusions and
Recommendation