Table 7.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Water
Quality |
170328-R03 |
Silt curtain at P98-99 should be well
maintained. |
Rectification/improvement
was observed during the follow-up audit session on 6 April 2017. |
Ecology |
N/A(1) |
N/A(1) |
N/A(1) |
Air
Quality |
170328-R02 |
Cement bags (>20) at P48 should be covered by impervious sheet. |
Rectification/improvement
was observed during the follow-up audit session on 6 April 2017. |
Noise |
N/A(1) |
N/A(1) |
N/A(1) |
Waste / Chemical Management |
170307-R01 |
Chemical containers at P56 should be
provided with drip tray and oil stain should be removed. |
Rectification/improvement was observed during the
follow-up audit session on 14 March 2017. |
170307-R02 |
General refuse at P56 should be cleared. |
Rectification/improvement was observed during the
follow-up audit session on 14 March 2017. |
|
170314-R01 |
Chemical containers at P69 should be provided with drip tray. |
Rectification/improvement
was observed during the follow-up audit session on 21 March 2017. |
|
170314-R01 |
Oil stain at P69 should be cleared. |
Rectification/improvement was observed during the
follow-up audit session on 21 March 2017. |
|
170321-R01 |
Accumulated waste at P67 should be sorted
properly. |
Rectification/improvement
was observed during the follow-up audit session on 28 March 2017. |
|
170321-R02 |
Oil stain at P67 and P68 should be cleared. |
Rectification/improvement
was observed during the follow-up audit session on 28 March and 6 April 2017. |
|
170321-R03 |
Secondary oil containment at P72 should be maintained properly to
avoid oil leakage and oily water inside should be cleared. |
Rectification/improvement
was observed during the follow-up audit session on 28 March 2017. |
|
170328-R01 |
Accumulated construction waste at P59 pile
cap and general waste at P45 and P49 should be cleared.. |
Rectification/improvement
was observed during the follow-up audit session on 6 April 2017. |
|
170328-R04 |
Oil stain at P68 should be cleared. |
Rectification/improvement
was observed during the follow-up audit session on 6 April 2017. |
|
Landscape & Visual Impact |
N/A(1) |
N/A(1) |
N/A(1) |
Permits/Licences |
N/A(1) |
N/A(1) |
N/A(1) |
Other |
N/A(1) |
N/A(1) |
N/A(1) |
Cultural Heritage (Sha Lo Wan (West)
Archaeological Site) |
14/3/2017 |
N/A(1) |
N/A(1) |
Remark: N/A(1) - No major environmental
deficiency was identified during the site inspection in the reporting month.