9.1
Major site activities for the coming reporting month will include:
WA4
¡P
Foundation works for Asphalt Plant
Ancillary and Associated Facilities
¡P
Sealing of deck openings and
preparation deck surface for waterproofing
¡P
Waterproofing and asphalt laying
¡P
Watermain installation
¡P
Installation of carrier drains
¡P
Installation of precast parapet
skins
¡P
Construction of median and side
barriers
¡P
Construction of longitudinal
stitching
¡P
Erection of sign gantry
¡P
Reinstatement of slope area and
drainage works
¡P
Reinstatement of sloping seawall
¡P
Fill slope for CLK South Road
realignment
¡P
Laying of asphalt pavement
¡P
Sealing of gantry crane loading
opening
E&M Works
¡P
E&M installation
¡P
E&M ducting installation
¡P
Street light cables and poles
installation
¡P
Cable hanger installation
¡P
Construction of Lad Centre
Marine Viaduct (P0 to P80)
Deck Erection
¡P
Segment erection
¡P
Temporary steel structure
dismantling
¡P
Erection of cantilever
¡P
Span erection
External Prestressing Tendon Installation
Internal Prestressing Grouting
Turnaround Facilities
¡P
Stitching works
¡P
Steel fixing
¡P
Erection of formworks
and steel fixing
¡P
Erection of extended
platform
9.2
The tentative environmental monitoring schedule for the next month is
shown in Appendix D.
9.3
A tentative construction programme is provided
in Appendix A.