Table 7.1       Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

170502-R01

Silt curtain at P84-85 should be well maintained.

Rectification/improvement was observed during the follow-up audit session on 9 May 2017.

170531-R04

Silt curtain at P82 should be properly maintained.

Rectification/improvement will be reported in next reporting month.

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

170516-R02

Water spraying should be provided to the concrete breaking works at P90 for dust suppression.

Rectification/improvement was observed during the follow-up audit session on 23 May 2017.

170531-R01

Dusty material at P70 should be removed or covered with impervious sheet.

Rectification/improvement will be reported in next reporting month.

170531-R02

The three side enclosure for the grouting machine at P76 should be maintained to ensure enclosing fully.

Rectification/improvement will be reported in next reporting month.

Noise

N/A(1)

N/A(1)

N/A(1)

Waste / Chemical Management

170502-R02

The chemical waste storage area at Portion C should be improved, including the size and wording of label and proper secondary containment.

Rectification/improvement was observed during the follow-up audit session on 16 May 2017.

170509-R01

Oil stain and oily water at P44 should be removed and hole on the drip tray should be plugged to prevent oil leakage.

Rectification/improvement will be reported in next reporting month.

170509-R03

Housekeeping should be enhanced at P44, 47.

Rectification/improvement was observed during the follow-up audit session on 16 May 2017.

170516-R01

Construction waste at P86 should be properly cleared.

Rectification/improvement was observed during the follow-up audit session on 23 May 2017.

170523-R01

Oil stain at P65, 67 should be removed and oil absorbent should be cleared as chemical waste.

Rectification/improvement will be reported in next reporting month.

170523-R02

Drip tray should be provided to the chemical containers at P57.

Rectification/improvement will be reported in next reporting month.

170523-R03

The chemical waste store at P57 should be provided with lock.

Rectification/improvement will be reported in next reporting month.

170523-R04

Proper chemical label should be provided to the chemical container at P59.

Rectification/improvement will be reported in next reporting month.

170523-R05

Housekeeping should be enhanced at P61.

Rectification/improvement will be reported in next reporting month.

170531-R03

Oil stain at P77 should be removed as chemical waste.

Rectification/improvement will be reported in next reporting month.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

N/A(1)

N/A(1)

N/A(1)

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

14/3/2017

N/A(1)

N/A(1)

Remark:     N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.