Table 7.1       Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Water Quality

170815-R01

Silt curtain at P97 Portion A should be properly maintained.

Rectification/improvement was observed during the follow-up audit session on 22 August 2017.

170829-R02

Muddy material near the site boundary of WA4 should be cleared.

Rectification/improvement will be reported in next reporting month.

170829-R04

Silt curtain at P89 Portion A should be properly maintained.

Rectification/improvement will be reported in next reporting month.

Ecology

N/A(1)

N/A(1)

N/A(1)

Air Quality

170801-R03

Dusty material at P91 should be removed or covered by impervious sheet.

Rectification/improvement will be reported in next reporting month.

170808-R01

Haul road at WA4 should be sprayed with water for dust suppression.

Rectification/improvement was observed during the follow-up audit session on 15 August 2017.

170808-R03

Stockpile of dusty material at P83 Portion A should be covered by impervious sheet or removed.

Rectification/improvement was observed during the follow-up audit session on 15 August 2017.

170808-R04

The water pipe should be repaired for water spraying during loading process and breaking work along P87-96 to suppress dust production.

Rectification/improvement was observed during the follow-up audit session on 15 August 2017.

170815-R02

Cement bags at P109 Portion C should be covered by impervious sheet.

Rectification/improvement was observed during the follow-up audit session on 22 August 2017.

170822-R01

Cement mixing works at P83 should be done in proper three-side enclosed area and with water spraying.

Rectification/improvement was observed during the follow-up audit session on 29 August 2017.

170822-R03

Dusty material at P72 should be covered with impervious sheet or removed.

Rectification/improvement was observed during the follow-up audit session on 29 August 2017.

170829-R06

Water spraying should be provided during the breaking works at Portion a P82 and Portion C for dust suppression.

Rectification/improvement will be reported in next reporting month.

Noise

N/A(1)

N/A(1)

N/A(1)

Waste / Chemical Management

170801-R01

Accumulated construction waste at P85-87 should be cleared.

Rectification/improvement will be reported in next reporting month.

170801-R02

Chemical containers at P97 should be removed as chemical waste.

Rectification/improvement was observed during the follow-up audit session on 8 August 2017.

170808-R02

Housekeeping at P82 should be enhanced at Portion A.

Rectification/improvement will be reported in next reporting month.

170815-R03

Chemical containers at Portion C gate should be with proper chemical labels.

Rectification/improvement was observed during the follow-up audit session on 22 August 2017.

170822-R02

Oil stain at P69 and P70 should be cleared and drip tray at P70 should be plugged to prevent oil leakage.

Rectification/improvement was observed during the follow-up audit session on 29 August 2017.

170822-R04

Chemical containers at P72 should be with proper chemical label and provided with drip tray.

Rectification/improvement was observed during the follow-up audit session on 29 August 2017.

170829-R01

Chemical waste in the chemical waste storage at WA4 should be provided with proper chemical label.

Rectification/improvement will be reported in next reporting month.

170829-R03

General waste and stand water in the container at WA4 should be removed.

Rectification/improvement will be reported in next reporting month.

170829-R05

Chemical container at P106 Portion C should be provided with drip tray.

Rectification/improvement will be reported in next reporting month.

Landscape & Visual Impact

N/A(1)

N/A(1)

N/A(1)

Permits/Licences

N/A(1)

N/A(1)

N/A(1)

Other

N/A(1)

N/A(1)

N/A(1)

Cultural Heritage

(Sha Lo Wan (West) Archaeological Site)

15/6/2017

N/A(1)

N/A(1)

Remark:     N/A(1) - No major environmental deficiency was identified during the site inspection in the reporting month.