9.1
Major site activities for the coming reporting month will include:
WA4
¡P
Establishment for Asphalt Plant
Ancillary
and Associated Facilities
¡P
Sealing of deck openings and preparation deck
surface for waterproofing
¡P
Waterproofing and asphalt laying
¡P
Watermain
installation
¡P
Installation of carrier drains
¡P
Installation of precast parapet skins
¡P
Construction of median and side barriers
¡P
Construction of longitudinal stitching
¡P
Erection of sign gantry
¡P
Reinstatement of slope area and drainage works
¡P
Reinstatement of sloping seawall
¡P
CLK South Road realignment
¡P
Laying of asphalt pavement
¡P
Sealing of gantry crane loading opening
E&M
Works
¡P
E&M installation
¡P
E&M ducting installation
¡P
E&M works inside SHT building
¡P
Street light cables and poles installation
¡P
Cable hanger installation
¡P
Construction of Load Centre
¡P
Pillar box installation
¡P
Installation for TCSS¡¦s CCTV high mast
¡P
Installation for HKPF¡¦s high mast
¡P
Installation for C&ED¡¦s high mast
Marine
Viaduct (P0 to P80)
Deck
Erection
¡P
Segment erection
¡P
Dismantling the remaining LF3
External
Prestressing Tendon Installation
Internal
Prestressing Grouting
Turnaround
Facilities
¡P
Steel fixing for longitudinal stitch between
box girders
¡P
Strands installation and stressing for
extended platforms
¡P
strands installation for stressing
¡P
Casting of stitches between I-beams and box
girder
¡P
Strands installation for I-beams
¡P
Assembly of Megashor
tower for corner beams
¡P
Erect 4 number of Corner Beams
9.2
The tentative environmental monitoring schedule for the next month is
shown in Appendix D.
9.3
A tentative construction programme is provided
in Appendix A.