1.1
Cinotech
Consultants Limited (Cinotech) was appointed by Dragages -China Harbour-VSL JV
(hereinafter called “the Contractor”) as the
Environmental Team (ET) to undertake the Environmental Monitoring and Audit
(EM&A) programme during construction phase of the
Contract No. HY/2011/09 – Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road –
Section between HKSAR Boundary and Scenic Hill” (hereinafter called the “Contract”) in accordance with EP Conditions 2.1.
1.2
This is the 56th EM&A report
which summarises the impact monitoring results and
audit findings for the EM&A programme in September
2017.
1.3
The structure of the report is as follows:
Section
1: Introduction - purpose and structure of the report.
Section
2: Contract Information - summarises
background and scope of the Contract, site description, project organization
and contact details, construction programme, the
construction works undertaken and the status of Environmental Permits/Licenses
during the reporting month.
Section
3: Air Quality Monitoring - summarises the
monitoring parameters, monitoring programmes,
monitoring methodologies, monitoring frequency, monitoring locations, Action
and Limit Levels, monitoring results and Event / Action Plans.
Section
4: Noise Monitoring - summarises the
monitoring parameters, monitoring programmes,
monitoring methodologies, monitoring frequency, monitoring locations, Action
and Limit Levels, monitoring results and Event / Action Plans.
Section
5: Water Quality Monitoring - summarises the
monitoring parameters, monitoring programmes,
monitoring methodologies, monitoring frequency, monitoring locations, Action
and Limit Levels, monitoring results and Event / Action Plans.
Section 6: Dolphin-Related
Monitoring - summarises the monitoring
parameters, monitoring programmes, monitoring
methodologies, monitoring frequency, monitoring locations and monitoring
results.
Section
7: Environmental Site Inspection - summarises
the audit findings of the weekly site inspections undertaken within the
reporting month.
Section 8: Environmental
Non-conformance - summarises any monitoring exceedance,
environmental complaints, environmental summons and successful prosecutions
within the reporting month.
Section 9: Future Key Issues - summarises the impact forecast and monitoring schedule for
the next three months.
Section 10:
Conclusions and Recommendation