8.1
Summary of exceedance is provided in Appendix L.
8.2
No Action/Limit Level exceedance was recorded
for air quality and construction noise.
8.3
All water quality monitoring was conducted as
scheduled in the reporting month. There are three Action Level and two Limit
Level exceedances were recorded for suspended solids. No Action/Limit Level exceedance
for dissolved oxygen and turbidity were recorded.
8.4
According to the investigation, the
exceedances are considered not due to the Contract due to the following reasons:
1) No
pollution discharge from construction activity was observed;
2) Adverse
water quality outside the site boundary was observed while no pollution source
from this Contract was observed and no construction vessel for this Contract
was travelling nearby. Dispersion of sediment plume to the monitoring stations
from the area outside the site boundary (i.e. works area not under and related to
HY/2011/09) was also observed.
Summary
of Environmental Complaint
8.5
No environmental related complaints were
received in the reporting month. The Complaint Log is attached in Appendix P.
8.6
There was one prosecution or notification of
summons received since the Contract commencement. Summary of successful prosecution