This is the 57th monthly Environmental Monitoring and Audit
(EM&A) Report prepared by Cinotech Consultants
Limited for the project
¡§Contract No. HY/2011/09 ¡V Hong
Kong-Zhuhai-Macao Bridge Hong Kong Link Road ¡V Section between HKSAR Boundary
and Scenic Hill¡¨ (hereinafter called the ¡§Contract¡¨). This report documents the findings of EM&A Works conducted in October
2017.
Environmental Monitoring and Audit Progress
2.
A summary of the monitoring activities in this reporting month is listed
in Table I below:
Table I Summary
Table for Monitoring Activities in the Reporting Month
Parameter(s) |
Date(s) |
1-hr
TSP Monitoring |
2nd, 7th,
13th, 19th, 25th and 31st October
2017 |
24-hr
TSP Monitoring |
2nd, 7th,
13th, 19th, 25th and 31st October
2017 |
Noise
Monitoring |
4th,
10th, 20th, 25th and 31st October
2017 |
Water
Quality Monitoring |
2nd, 4th,
6th, 9th, 11th, 14th, 16th,
18th, 20th, 23rd, 25th, 27th
and 30th October 2017 |
10th and 24th
October 2017 |
|
Environmental
Site Inspection |
3rd, 10th,
17th, 24th and 31st October 2017 |
Archaeological
Site Inspection |
12th September
2017 |
Breaches of Action and Limit Levels
3.
Summary of the environmental exceedances of the reporting month is
tabulated in Table II.
Table II Summary
Table for Events Recorded in the Reporting Month
Environmental Monitoring |
Parameter |
No. of Exceedance |
Total
No. of Exceedance |
No. of Exceedance related to the Construction Activities of this Contract |
Total No. of Exceedance related to the Construction Activities of this Contract |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
||||
Air Quality |
1-hr TSP |
0 |
0 |
0 |
0 |
0 |
0 |
24-hr TSP |
0 |
0 |
0 |
0 |
0 |
0 |
|
Noise |
Leq(30min) |
0 |
0 |
0 |
0 |
0 |
0 |
Water Quality |
Dissolved Oxygen (DO)
(Surface & Middle) |
0 |
0 |
0 |
0 |
0 |
0 |
Dissolved Oxygen (DO)
(Bottom) |
0 |
0 |
0 |
0 |
0 |
0 |
|
Turbidity |
0 |
0 |
0 |
0 |
0 |
0 |
|
Suspended Solids (SS) |
10 |
2 |
12 |
0 |
0 |
0 |
1-hour
TSP Monitoring
4.
All 1-hour TSP monitoring was conducted as scheduled in the reporting. No
Action/Limit Level exceedance was recorded.
24-hour
TSP Monitoring
5.
All 24-hour TSP monitoring was conducted as scheduled in the reporting month. No Action/Limit Level exceedance was
recorded.
Construction
Noise
6.
All construction noise monitoring was conducted as scheduled in the
reporting month. No Action/Limit Level exceedance was recorded.
Water Quality
7.
All water quality monitoring was conducted as scheduled in the reporting
month. There are ten Action Level
and two Limit Level exceedances were recorded for suspended solids. No
Action/Limit Level exceedance for dissolved oxygen and turbidity were recorded.
8.
According to the investigation,
the exceedances are considered not due to the Contract due to the following
reasons:
1)
No pollution discharge from construction activity was observed;
2)
The exceeded results were similar or within the ranges baseline
monitoring results;
3)
Monitoring station is situated at the upstream of the construction sites
4)
Sediment plume due to natural fluctuation of shallow water was observed;
5)
Localized sediment plume due to the rough water condition was observed;
6)
Adverse water quality outside the site boundary was observed while no
pollution source from this Contract was observed and no construction vessel for
this Contract was travelling nearby. Dispersion of sediment plume to the
monitoring stations from the area outside the site boundary (i.e. works area
not under and related to HY/2011/09) was also observed.
Complaint Log
9.
No environmental complaint was received in the reporting month.
Notification of
Summons and Successful Prosecutions
10.
No notification of summons and successful prosecution was received in
the reporting month.
11.
This report has been developed in compliance with the reporting
requirements for the subsequent monthly EM&A Report as required by the
EM&A Manual for Hong Kong Link Road (EM&A Manual).
12.
Major site activities for
the coming reporting month will include:
WA4
¡P
Establishment for Asphalt Plant
Ancillary
and Associated Facilities
¡P
Breaking off the concrete footings for
reinstatement of slope underneath the deck
¡P
Reinstatement of sloping seawall
¡P
Installation of precast parapet facial panel
¡P
Construction of median and side barriers
¡P
Construction of longitudinal stitching
¡P
Sealing of deck openings and preparation deck
surface for waterproofing
¡P
Installation of fire main
¡P
Erection of sign gantry
¡P
Installation of stormwater
drainage
¡P
Site clearance / formation work to
reinstatement of South Perimeter Road
¡P
Fill slope and roadworks for Chek Lap Kok South Road realignment
¡P
Installation of carrier drains
¡P
Installation of watermain
¡P
Laying of asphalt pavement
E&M
Works
¡P
E&M ducting installation
¡P
E&M works inside SHT building
¡P
Street light cables and poles installation
¡P
Cable hanger installation
¡P
Construction of Load Centre
¡P
Optic fibre cable
laying works
¡P
LV and HV cable laying works
¡P
Cable tray installation
Marine
Viaduct (P0 to P80)
Deck
Erection
¡P
Dismantling works
¡P
Stitching works
¡P
Movement joints installation
External
Prestressing Tendon Installation
Internal
Prestressing Grouting
Turnaround
Facilities
¡P
Casting at top slab for longitudinal stich
¡P
Petrol interceptor rebar fixing
¡P
Erection of falsework and formwork
¡P
Wingslab
falsework erection
¡P
Sling platform erection
¡P
Grouting bearing plinth
¡P
Load transfer on bearing
¡P
Concrete stitching
¡P
Erect 4 number of Corner Beams