8.1
Summary of exceedance is provided in Appendix L.
8.2
No Action/Limit Level exceedance was recorded for air quality and
construction noise.
8.3
All water quality monitoring was conducted as scheduled in the reporting
month. There are three Action Level and one Limit Level exceedances were
recorded for suspended solids. No Action/Limit Level exceedance for dissolved
oxygen and turbidity were recorded.
8.4
According to the investigation, the exceedances are considered not due
to the Contract due to the following reasons:
1)
No pollution discharge from construction activity was observed;
2)
Control Station value already exceeded either the Baseline Action or
Limit Levels.;
3)
Adverse water quality outside the site boundary was observed while no
pollution source from this Contract was observed and no construction vessel for
this Contract was travelling nearby. Dispersion of sediment plume to the
monitoring stations from the area outside the site boundary (i.e. works area
not under and related to HY/2011/09) was also observed.
Summary of Environmental Complaint
8.5
No environmental related complaints were received in the reporting month.
The Complaint Log is attached in Appendix
P.
8.6
There was one prosecution or notification of summons received since the Contract
commencement. Summary of successful prosecution as attached in Appendix Q.