9.1
Major site activities for the coming reporting month will include:
WA4
¡P
Operation of Asphalt Plant
Ancillary
and Associated Facilities
¡P
Breaking off the concrete footings for
reinstatement of slope underneath the deck
¡P
Reinstatement of sloping seawall
¡P
Installation of precast parapet facial panel
¡P
Construction of median and side barriers
¡P
Construction of longitudinal stitching
¡P
Sealing of deck openings and preparation deck
surface for waterproofing
¡P
Installation of fire hydrants and fire main
¡P
Installation of utility trough covers
¡P
Erection of sign gantry
¡P
Installation of the additional pier number and
information signs
¡P
Installation of the headroom sign and vessel
length restriction sign
¡P
Installation of the height restriction sign
¡P
Site clearance / formation work to
reinstatement of SPR
¡P
Construction of concrete carriageway for Chek Lap Kok South Road
realignment*
¡P
Installation of carrier drains
¡P
Installation of watermain
¡P
Laying of asphalt pavement
¡P
Fill slope and road works for Chek Lap Kok South Road
realignment*
Note:
*Minor Modification Works:-
¡PShifting the bus stop location;
¡PShifting the old alignment near P109 southward; and
¡PRe-instating the underground drainage with the new
alignment due to the minor modification works above.
E&M
Works
¡P
E&M ducting installation
¡P
E&M works inside SHT building
¡P
Street light cables and poles installation
¡P
Cable hanger installation
¡P
LV and HV cable laying works
¡P
Cable tray installation of SMS system
¡P
Cable laying works for HKPF
¡P
GPS pole installation
¡P
Installation of electrical sliding barrier
¡P
Installation of pile cap lighting
¡P
Installation of radar at radar platform
Removal
of Temporary works at P68 - P70
Deck
Erection
¡P
Movement joints installation
Turnaround
Facilities
¡P
Casting of wingslab
¡P
Casting of roof finishing and ground level
finish of mobile telecom equipment room
¡P
Apply waterproof membrane for mobile telecom
equipment room
¡P
Dismantling of sling platform, box girder
support tower and extended platform
¡P
Installation of Type K1 Kerb
for traffic island
¡P
Parapet installation
10m
at P0
¡P
Construction of central barrier and side
barriers
¡P
Construction of the utility trough
¡P
9.2
The tentative environmental monitoring schedule for the next month is
shown in Appendix D.
9.3
A tentative construction programme is provided
in Appendix A.