1.
This is the 61st monthly Environmental Monitoring and Audit
(EM&A) Report prepared by Cinotech Consultants Limited for the project
¡§Contract No. HY/2011/09 ¡V Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road ¡V
Section between HKSAR Boundary and Scenic Hill¡¨ (hereinafter called the
¡§Contract¡¨). This report documents the findings of EM&A Works conducted in February 2018.
Environmental
Monitoring and Audit Progress
2.
A summary of the monitoring activities in this reporting month is listed
in Table I below:
Table I Summary
Table for Monitoring Activities in the Reporting Month
Parameter(s) |
Date(s) |
1-hr
TSP Monitoring |
2nd,
8th, 14th, 20th and 26th February
2018 |
24-hr
TSP Monitoring |
2nd,
8th, 14th, 20th and 26th February
2018 |
Noise
Monitoring |
9th,
15th, 21st and 27th February 2018 |
Water
Quality Monitoring(1) |
2nd,
5th, 7th, 9th, 12th, 14th,
20th, 22nd, 24th, 26th and 28th
February 2018 |
8th
and 23rd February 2018 |
|
Environmental
Site Inspection |
6th,
13th, 20th and 27th February 2018 |
Remark: (1) No
marine construction works was conducted in the period between 16th
and 19th February 2018 (Lunar New Year's Holiday).
Breaches of Action and Limit Levels
3.
Summary of the environmental exceedances of the reporting month is
tabulated in Table II.
Table II Summary Table
for Events Recorded in the Reporting Month
Environmental Monitoring |
Parameter |
No. of Exceedance |
Total No. of Exceedance |
No. of Exceedance related to the Construction Activities of this
Contract |
Total No. of Exceedance related to the Construction Activities of this
Contract |
||
Action Level |
Limit Level |
Action Level |
Limit Level |
||||
Air Quality |
1-hr TSP |
0 |
0 |
0 |
0 |
0 |
0 |
24-hr TSP |
0 |
0 |
0 |
0 |
0 |
0 |
|
Noise |
Leq(30min) |
0 |
0 |
0 |
0 |
0 |
0 |
Water Quality |
Dissolved Oxygen
(DO) (Surface & Middle) |
0 |
0 |
0 |
0 |
0 |
0 |
Dissolved Oxygen
(DO) (Bottom) |
0 |
0 |
0 |
0 |
0 |
0 |
|
Turbidity |
0 |
0 |
0 |
0 |
0 |
0 |
|
Suspended Solids
(SS) |
6 |
0 |
6 |
0 |
0 |
0 |
|
Dolphin Monitoring
|
Line-transect
Vessel Surveys (December 2017 to February 2018) |
0 |
1 |
1 |
Under
investigation |
1-hour TSP Monitoring
4.
All 1-hour TSP monitoring was conducted as scheduled in the reporting
month. No Action/Limit Level exceedances were recorded.
24-hour TSP Monitoring
5.
All 24-hour TSP monitoring was conducted as scheduled in the reporting
month. No Action/Limit Level exceedances were recorded.
Construction Noise
6.
All construction noise monitoring was conducted as scheduled in the
reporting month. No Action/Limit Level exceedance was recorded.
Water Quality
7.
All water quality monitoring was conducted as scheduled in the reporting
month. There are six Action Level
and no Limit Level exceedances were recorded for suspended solids. No
Action/Limit Level exceedance for dissolved oxygen and turbidity were recorded.
8.
According to the investigation, the exceedances are considered not due
to the Contract due to the following reasons:
1) No
pollution discharge from construction activity was observed;
2) Sediment
plume due to natural fluctuation of shallow water was observed; and
3) Dispersion
of sediment plume to the monitoring stations from the area outside the site
boundary (i.e. works area not under and related to HY/2011/09) was observed.
Dolphin Monitoring
9.
One
Limit Level exceedance was recorded for dolphin monitoring according to the quarterly
monitoring data in the period between December 2017 and February 2018. The
exceedance will be reported and evaluation of impacts on dolphins due to
construction work will be presented in the quarterly EM&A report (December
2017 to February 2018).
Complaint Log
10.
No environmental complaint was received in the reporting month.
Notification of Summons and Successful Prosecutions
11.
No notification of summons and successful prosecution was received in
the reporting month.
12.
This report has been developed in compliance with the reporting
requirements for the subsequent monthly EM&A Report as required by the
EM&A Manual for Hong Kong Link Road (EM&A Manual).
13.
Major site activities for the coming reporting month will include:
WA4
There should be no environmental issue due to the Asphalt
Plant at WA4 as the ASL Asphalt Plant has been abandoned since 9 February 2018.
Ancillary
and Associated Facilities
¡P
Reinstatement of slope area and drainage works
at P115 interface area;
¡P
Continue reinstatement of sloping seawall at
Portion A;
¡P
Continue reinstatement works at South
Perimeter Road;
¡P
Rehabilitation works for existing drains and
sewerage at South Perimeter Road between P81 to P84 commence;
¡P
Commence road lighting at Scenic Road;
¡P
Continue construction of drainage at P113;
¡P
Continue installation of carrier drains at
ML8;
¡P
Continue installation of water main at ML8;
¡P
Continue installation of utility trough
covers;
¡P
Continue remaining road marking works;
¡P
Continue installation of the additional pier
number and information signs.
E&M
Works
¡P
Continue installation of the pile cap
lighting;
¡P
Complete installation of the additional LED
flood light;
¡P
Commence installation of red obstacle light at
high mast.
Removal
of Temporary works
¡P
Continue P69 & 70 jetty dismantling works
and P68 platform removal works;
¡P
Continue defect repairing works on bridge
bearings;
¡P
Continue APC Temporary Platforms under the MJ
pier;
¡P
Continue Western Water NSS temporary platforms
removal.
Turnaround
Facilities
¡P
Construction of U-channel at top of
Turnaround.
10m Works at P0
Interface
¡P
Road marking work at 10m interface area.