10.1
The Environmental Monitoring
and Audit (EM&A) Report presents the EM&A works undertaken in March 2018 in accordance with EM&A Manual.
10.2
No Action/Limit Level
exceedance was recorded for air quality and construction noise.
10.3
All water quality monitoring was
conducted as scheduled in the reporting month. There are three Action Level and
no Limit Level exceedances were recorded for suspended solids. No Action/Limit
Level exceedance for dissolved oxygen and turbidity were recorded.
10.4
Dolphin
transect survey was carried out on 7th and 15th March
2018. No adverse impact on Chinese White Dolphins was noticeable from general
observations.
10.5
Environmental site inspection was
conducted on 6th, 13th, 20th and 27th March
2018by ET in the reporting month. All deficiencies identified during the site inspection have already
rectified / improved during the follow-up audit session.
10.6
The inspection to the Sha Lo
Wan (West) Archaeological Site was conducted on 27th March 2017.
No access to Sha Lo Wan (West) Archaeological site for works areas and storage
of construction equipment was observed.
10.7
There was no environmental
complaints, no notification of summons and successful prosecution
received in the reporting month.
10.8
The ET will keep track on the
EM&A programme to ensure compliance of environmental requirements and the
proper implementation of all necessary mitigation measures.
10.9
According to the environmental
audit performed in the reporting month, the following recommendations were made:
Air Quality Impact
¡P To regularly maintain the quality
of machinery and
vehicles on site.
¡P To implement dust suppression
measures on all haul roads, stockpiles, dry surfaces and excavation works.
¡P To provide hoarding along the entire length of that portion of the site boundary.
Noise Impact
¡P To inspect the noise sources
inside the site.
¡P To space out noisy equipment and
position the equipment as far away as possible from sensitive receivers.
¡P To provide temporary noise
barriers for operations of noisy equipment near the noise sensitive receivers, if
necessary.
Water Impact
¡P
To prevent any surface runoff
discharge into any stream course and sea.
¡P
To review and implement temporary
drainage system.
¡P
To identify any wastewater
discharges from site.
¡P
To ensure properly maintenance
for de-silting facilities.
¡P
To clear the silt and sediment
in the sedimentation tanks.
¡P
To review the capacity of
de-silting facilities for discharge.
¡P
To divert all the water
generated from construction site to de-silting facilities with enough handling
capacity before discharge.
¡P
To avoid accumulation of stagnant and ponding water on site.
Ecology Impact
¡P
To implement Spill Response Plan in the event of accidental
spillage of or other hazardous chemicals.
¡P
To implement Dolphin Exclusion Zone during the installation of
bored pile casing located in the waters to the west of Airport.
¡P
To implement Dolphin Watching Plan after the bored piling casing
is installed.
¡P
To ensure the acoustically-decoupled measures were implemented for air
compressors and other noisy equipment mounted on construction vessels according
to acoustic decoupling measures plan.
Waste/Chemical Management
¡P
To
check for any accumulation of waste materials or rubbish on site.
¡P
To ensure the performance of sorting of C&D
materials at source (during generation);
¡P
To carry out inspection of dump truck at site exit
to ensure inert and non-inert C&D materials are properly segregated before
removing off site.
¡P
To
avoid any discharge or accidental spillage of chemical waste or oil directly from the
site.
¡P
To
avoid improper handling or storage of oil drum on site.